My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 1: Mitigation Monitoring and Reporting Program <br />Timeframe for Responsibility for <br />Impact <br />Mitigation Measures <br />Implementation Implementation <br />NO1-2: Noise from construction <br />N0I-2: The project contractor shall implement the <br />During all phases Project Applicant <br />activities would result in a <br />following measures during construction of the proposed <br />of construction <br />substantial temporary or <br />project: <br />Construction <br />periodic increase in ambient <br />• Equip all construction equipment, fixed or mobile, with <br />Contractor <br />noise levels in the project <br />properly operating and maintained mufflers consistent <br />vicinity above levels existing <br />with manufacturers' standards. <br />without the project. <br />• Place all stationary construction equipment so that <br />emitted noise is directed away from sensitive receptors <br />nearest the active project site. <br />• Locate equipment staging in areas that would create the <br />greatest possible distance between construction -related <br />noise sources and noise -sensitive receptors nearest the <br />active project site during all project construction. <br />• Ensure that all general construction related activities are <br />restricted to between the hours of 7:00 a.m. and 8:00 <br />p.m. on weekdays. No construction shall be permitted <br />on weekends or holidays. <br />Post a sign at all entrances to the work site prior to <br />commencement of the work for the purpose of <br />informing all contractors and subcontractors and all <br />other persons at the property of the basic limitations <br />upon noise and construction activities provided in the <br />noise ordinance. <br />Designate a "disturbance coordinator" at the City of <br />Redwood City who would be responsible for responding <br />to any local complaints about construction noise. The <br />disturbance coordinator would determine the cause of <br />the noise complaint (e.g., starting too early, bad muffler) <br />and would determine and implement reasonable <br />measures warranted to correct the problem. <br />ATTY/RESO.0035/CC RE50 CERTIFYING FINAL EIR —1548 MAPLE <br />REV: 04-30-18 PR <br />Page 39 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />Oversight of <br />Implementation <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.