Laserfiche WebLink
are acceptable to you. <br />85. North Main Street Mitigation Measures — Implement and comply with all <br />applicable mitigation measures described in the Mitigated Negative <br />Declaration (NMD) and Mitigation Monitoring Program (MMRP) for the North <br />Main Street Precise Plan (listed below). [SDR][PLANNING] <br />a. Aesthetics (Lighting) —Mitigation Measure #1: Project sponsors shall <br />submit an exterior lighting plan that includes only exterior lighting <br />fixtures that do not allow direct light rays to leave the project site and <br />which also do not allow direct light sources (incandescent, fluorescent, <br />or other forms of electric illumination) to be directly visible from off-site <br />locations. The plan shall include a photometric site plan and be subject <br />to review and approval by the Community Development Services <br />Department. [SDR][PLANNING] <br />b. Air Quality (Construction Emissions) — Mitigation Measure #2: <br />Implementation of the following BAAQMD Basic Measures as part of <br />each project will minimize PM10 emissions and will reduce <br />construction -related air quality impacts to a less than significant level. <br />[COA][PLANNING] <br />i. Water all active construction areas at least twice daily. <br />ii. Cover all trucks hauling soil, sand and other loose materials <br />or require all trucks to maintain at least two feet of freeboard. <br />iii. Pave, apply water three times daily, or apply (non-toxic) <br />soil stabilizers on all unpaved access roads, parking areas, <br />and staging areas at construction sites. <br />iv. Sweep daily (with water sweepers) all paved access roads, <br />parking areas and staging areas at construction sites. <br />V. Sweep streets daily if visible soil material is carried onto <br />adjacent public streets. <br />Vi. If parcels are assembled to create a building site of greater <br />than four acres, the City would require that the Enhanced <br />Measures be implemented during construction. <br />G. Biological Resources (Redwood Creek Bank Modification) — <br />Mitigation Measure #3: Prior to any modifications to the Redwood <br />Creek channel and adjacent northern coastal salt marsh habitat, project <br />developers shall consult with the USFWS and CDFG regarding <br />proposed modifications and construction activities to determine if they <br />could result in "take" of a Federal or State protected species. The <br />USFWS may presume presence or may recommend additional focused <br />surveys to determine if any of these species are present on site. Project <br />design modifications, as well as appropriate mitigation measures <br />ATTY/RESO.0041/CC RESO DENYING THE APPEAL FOR 353 MAIN STREET RESO NO. 15665 <br />REV: 05-14-18 PR MUFF NO. 603 <br />Page 24 of 29 <br />