My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:37 AM
Creation date
10/11/2019 8:01:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING AN ARCHITECTURAL PERMIT, PLANNED DEVELOPMENT PERMIT, USE PERMIT, VESTING TENTATIVE MAP, STATE DENSITY BONUS LAW CONCESSIONS AND AN AFFORDABLE HOUSING PLAN FOR THE BROADWAY PLAZA PROJECT LOCATED AT 1401 BROADWAY AND 2201 BAY ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />4. Reduced Parking - A ratio of 2.95/1,000 spaces for the office uses is permitted through <br />approval of the Planned Development permit. [COA] [PLANNING] <br />Mitigation Measures - Provide written documentation of compliance with all required <br />mitigation measures in the Mitigation Monitoring and Reporting Program (MMRP) established <br />by the certified Environmental Impact Report prior to issuance of Final certificate of occupancy. <br />[COA][PLANNING] <br />Fees <br />The following fees must be paid in full prior to issuance of the building permit unless otherwise <br />described below. <br />6. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from the <br />proposed project, estimated at $758,373. These fees must be paid in full prior to the issuance <br />of each respective building permit. [SDR] [ENGINEERING] <br />7. Transportation Fair Share Contribution- Pay the project's fair share contribution for the US <br />101/Woodside Road Interchange Improvement Project, estimated at $3,062,050, a mitigation <br />for the project further described in the Environmental Impact Report prior to issuance of the <br />first building permit. [SDR] [ENGINEERING] <br />8. Water and Sewer Fees - Pay applicable water, recycled water, and wastewater -related fees as <br />outlined on the City's website. These fees must be paid in full prior to the issuance of each <br />respective building permit. [SDR][ENGINEERING] <br />9. Parks Impact Fee - Pay a Parks Impact Fee for the net new dwelling units resulting from the <br />proposed project, estimated at $4,653,776.97 prior to final map approval. [SDR] [PARKS] <br />10. Emergency Water Storage Fair Share Contribution - Pay a fair share towards the <br />emergency potable water storage needs of the City as mitigation for the project described in <br />the Environmental Impact Report prior to issuance of a Temporary or Final Certificate of <br />Occupancy (whichever is issued first) of any office building. [MMRP][ENGINEERING] <br />11. School Impact Fee - For residential additions greater than 500 square feet and new <br />commercial or industrial construction, pay a School Impact Fee to the Sequoia Union High <br />School District. Information regardingthis fee maybe obtained by contactingthe Sequoia Union <br />High School District at (650) 369-1411. [SDR] [SCHOOL DISTRICT] <br />12. Notice of Fees Protest- The applicant may protest any fees, dedications, reservations, or other <br />exactions imposed by the City as part of the approval or as a condition of approval of this <br />development. Per California Government Code Section 66020, this 90 -day protest period has <br />begun as of the date of the approval of this application. [SDR] [OFFICE OF THE CITY ATTORNEY] <br />Landscaping and Site Improvements <br />13. Water -Efficient Landscaping - Provide a landscaping and irrigation plan conforming to the <br />California Water -Efficient Landscape Ordinance (AB 1881), including an automatic irrigation <br />system (drip, micro -spray, or bubblers) with a rain sensor, and show these measures on the <br />building permit plans. [COA][PLANNING] <br />ATTY/RESO.0051 CC RESO APPROVING PROJECT—BROADWAY PLAZA RESO. NO. 15769 <br />REV: 05-15-19 PR MUFF NO. 601 <br />Page 9 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.