My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />management and engineering and economic feasibility. The EPA RAA Guide <br />provides an example of three differing perspectives for defining reasonable <br />assurance (USEPA 2017): <br />• Regulator Perspective - Reasonable assurance is a demonstration <br />that the implementation of a GI Plan will result in sufficient pollutant <br />reductions over time to address TMDL WI -As or other targets <br />specified in the MRP. <br />• Stakeholder Perspective - Reasonable assurance is a demonstration <br />that specific management practices are identified with sufficient <br />detail, and implemented on a schedule to ensure that necessary <br />improvements in water quality will occur. <br />• Permittee Perspective - Reasonable assurance is based on a detailed <br />analysis of the TMDL WI -As and associated MRP targets themselves, <br />and a determination of the feasibility of those requirements. The <br />RAA may also assist in evaluating the financial resources needed to <br />meet pollutant reductions based on schedules identified in the MRP. <br />Appendices C and D provide full documentation of the technical approaches <br />and results of the SMCWPPP RAA, which are consistent with the <br />recommendations of the EPA RAA Guide and Bay Area RAA Guidance. <br />2.3 Preliminary Identification of Opportunities for GI <br />Projects <br />To support the RAA and GI Plans, C/CAG has initiated a number of planning <br />efforts that identify opportunities for GI implementation. The following is a <br />summary of those efforts: <br />• Low Impact Development (LID) for New Development and <br />Redevelopment — The MRP includes a Provision (C.3) for the <br />integration of LID within new development and redevelopment. As <br />LID techniques are implemented as new development and <br />redevelopment occurs throughout Redwood City, the benefits of <br />such practices in terms of reducing urban runoff flows and <br />associated pollutant loads can be considered as part of the pollutant <br />load reductions attributed to implementation of GI. C/CAG worked <br />with San Mateo County Permittees to compile information on LID <br />practices that have been implemented within new development and <br />redevelopment since water year 2003 (baseline year for the TMDL). <br />C/CAG also performed an analysis to project the number of acres of <br />future new development and redevelopment to be addressed <br />through Provision C.3 by 2040. The RAA considers existing LID <br />practices and projections of LID in future new development and <br />RWC GREEN INFRASTRUCTURE PLAN <br />GREEN INFRASTRUCTURE PLAN <br />Figure 2. SRP Prioritized Green <br />Street Opportunities. <br />11 JUNE 2019 <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBIT A RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.