My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />• . Baseline <br />Data Results <br />• Rainfall Watershed Model t, Hourly runoff and <br />= sediment/pollutant <br />• HRUs/Land <br />Use loads <br />• Impervious <br />• Elevation <br />•Slopes <br />•Evaporation <br />• Infiltration <br />GI Capacities <br />and Capture ,I <br />IoIumes <br />for <br />Target <br />Reductions <br />ME-� <br />Figure 3. Modeling System Supporting the RAA. <br />GREEN INFRASTRUCTURE PLAN <br />Optimize by <br />Subcatchment <br />For this analysis, model cost functions were developed from literature; <br />including an inventory of projects in the Los Angeles region. Because of <br />uncertainty regarding the true costs to C/CAG member agencies, results were <br />normalized for relative comparison—the relative costs between project types <br />is well represented for the optimization of project types in the RAA. In other <br />words, although it is not recommended to use the RAA costs to project county- <br />wide or city-wide implementation costs, they are sufficiently resolved for <br />comparing alternative implementation scenarios and selecting the most cost- <br />effective strategies and combination of GI, LID, and regional stormwater <br />capture projects to meet pollutant reduction targets. <br />The LSPC model provides a characterization of existing conditions and <br />determination of necessary pollutant load reductions to meet requirements of <br />TMDLs and the MRP. SUSTAIN provides analysis of the amount of GI needed <br />to provide the portion of the load reduction assigned to GI by the MRP. <br />Appendices C and D provide more detailed discussion of the models and their <br />application to the San Mateo County watersheds. <br />2.5 Model Considerations to Inform GI Plans <br />An important consideration for the RAA was the ability to track costs and <br />benefits of different categories of GI projects within the model. This tracking <br />RWC GREEN INFRASTRUCTURE PLAN <br />14 JUNE 2019 <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN – EXHIBIT RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.