My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />was performed for GI project categories within each model subwatershed and <br />municipal jurisdiction, and supports the selection of the most cost-effective <br />implementation strategy to attain pollutant reduction goals. The RAA builds <br />upon the previous planning efforts and represents the following generalized <br />GI project categories in the model: <br />• Existing Projects: Stormwater treatment and GI projects that have <br />been implemented since FY -2004/05. This primarily consists of all of <br />the regulated projects that were mandated to treat runoff via <br />Provision C.3 of the MRP, but also includes any public green street <br />or other demonstration projects that were not subject to Provision <br />C.3 requirements. For regulated projects in the early years of C.3 <br />implementation, stormwater treatment may have been achieved <br />through non -GI means, such as underground vault systems or media <br />filters. <br />• Future New Development and Redevelopment: All the regulated <br />projects that will be subject to Provision C.3 requirements to treat <br />runoff via LID and is based on spatial projections of future new and <br />redevelopment tied to regional models for population and <br />employment growth. <br />• Regional Projects (identified): C/CAG worked with agencies to <br />identify five projects within public parks or Caltrans property to <br />provide regional capture and infiltration/treatment of stormwater, <br />and included conceptual designs to support further planning and <br />designs. Note — the model can be updated to include future <br />identified projects to support adaptive management. <br />• Green Streets: The SRP identified and prioritized opportunities <br />throughout San Mateo County for retrofitting existing streets with <br />GI in public rights-of-way. Green streets were ranked as high, <br />medium, and low priority (within each subwatershed) based on a <br />multiple -benefit prioritization process developed for the SRP. <br />• Other GI Projects (to be determined): Other types of GI projects on <br />publicly owned parcels, representing a combination of either <br />additional parcel -based GI or other Regional Projects. The SRP <br />screened and prioritized public parcels for opportunities for onsite <br />LID and Regional Projects. These opportunities need further <br />investigation to determine the best potential projects. <br />The RAA considers the numerous GI project opportunities that exist within <br />each municipal jurisdiction, and selects a suite or "recipe" of projects that can <br />most cost-effectively address pollutant load reductions. The amount and <br />combination of those GI projects can be determined through analysis of <br />estimated load reductions and implementation costs. Figure 4 presents an <br />example GI recipe showing the distribution of selected GI project categories <br />versus incremental reductions in pollutant loading and increasing cost. Cost- <br />RWC GREEN INFRASTRUCTURE PLAN <br />GREEN INFRASTRUCTURE PLAN <br />® Future New and Redevelopment <br />........................ --------------- ---------- <br />0 Existing Projects <br />Implementation Cost s) <br />Figure 4. Example Implementation <br />Recipe Showing <br />General Sequencing of <br />GI Projects. <br />15 JUNE 2019 <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBITA RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.