My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />benefit optimization of GI project opportunities was included to build upon <br />the preliminary C/CAG SRP planning efforts above, and to properly inform and <br />set meaningful goals for GI Plans. For each optimized combination of GI <br />projects, SUSTAIN provides an estimate of the resulting pollutant load <br />reduction and implementation costs, allowing for the comparison of GI <br />implementation scenarios and the selection of the most cost-effective <br />implementation plan to address pollutant reduction goals, whether at the <br />scale of an individual jurisdiction or across municipal boundaries. <br />2.6 Goals for GI Implementation <br />As discussed in Section 2.2, depending on the perspective of the regulators, <br />stakeholders, or Permittees, the purpose and expectations of the RAA can vary <br />in terms of how reasonable assurance is demonstrated. As a result, the output <br />from the RAA must consider multiple perspectives and strike the right balance <br />between detail and specificity while still leaving ample opportunity to allow <br />for future adaptive management. The following are key considerations for the <br />RAA output: <br />• Demonstrate PCBs and Mercury Load Reductions — The primary <br />goal of the RAA is to quantitatively demonstrate that GI Plans and <br />Control Measure Implementation Plans will result in load reductions <br />of PCBs and mercury sufficient to attain their respective TMDL WLAs <br />and the component stormwater improvement goals to be achieved <br />with GI. Based on the baseline hydrology and water quality model <br />(Appendix C), the RAA determined that a 17.6% reduction in PCB <br />loads is needed to meet the GI implementation goals established by <br />the MRP. Zero reduction in mercury loads was determined to be <br />needed from MRP areas because baseline loads were predicted to <br />be below the TMDL WLA for San Mateo County. As a result, a 17.6% <br />reduction in PCB loads is established as the primary pollutant <br />reduction goal for the GI Plan. However, there is some uncertainty in <br />terms of how PCB source areas are represented in the model, which <br />will require more monitoring and analysis in the future to gain an <br />improved understanding of PCB source areas and the ability to target <br />these areas with GI. Since PCBs are generally understood to be <br />transported with cohesive sediment (e.g., silt and clay), cohesive <br />sediment load can serve as a surrogate on which to base a load <br />reduction target. The RAA considers a 17.6% reduction of cohesive <br />sediment load as a more conservative surrogate until a better <br />understanding is reached in terms of specific PCB source areas within <br />the County. If additional PCB source areas are confirmed, these areas <br />could be targeted for source control measures or additional GI <br />implementation, likely resulting in greater effectiveness for GI to <br />reduce PCB loads in those areas, and thus redistributing or reducing <br />RWC GREEN INFRASTRUCTURE PLAN <br />GREEN INFRASTRUCTURE PLAN <br />16 JUNE 2019 <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBITA RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.