My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />the overall amount of GI needed to meet the load reduction target <br />based on sediment loading estimates. <br />• Develop Metrics to Support Implementation Tracking — The MRP <br />(Provision C.3.j) also requires tracking methods to provide <br />reasonable assurance thatTMDL WI -As are being met. Provision C.3.j <br />states that the GI Plan "shall include means and methods to track the <br />area within each Permittee's jurisdiction that is treated by green <br />infrastructure controls and the amount of directly connected <br />impervious area" Through C/CAG's current effort preparing a <br />Sustainable Streets Master Plan for San Mateo County, a tracking <br />tool will be developed that will enable calculation of metrics <br />consistent with the results of the RAA and additional metrics <br />relevant to sustainable street implementation. The tracking tool is <br />planned for completion in 2020. <br />• Support Adaptive Management — Given the relatively small scale of <br />most GI projects (e.g., LID on an individual parcel or a single street <br />block converted to green street), numerous individual GI projects <br />will be needed to address the pollutant reduction goals. All the GI <br />projects will require site investigations to assess feasibility and costs. <br />As a result, the RAA provides a preliminary investigation of the <br />amount of GI needed spatially (e.g., by subwatershed and municipal <br />jurisdiction) to achieve the countywide pollutant load reduction <br />target. The RAA sets the GI Plan "goals" in terms of the amount of GI <br />implementation over time to address pollutant load reductions. As <br />GI Plans are implemented and more comprehensive municipal <br />engineering analyses (e.g., masterplans, capital improvement plans) <br />are performed, the adaptive management process will be key to <br />ensuring that goals are met. In summary, the RAA informs GI <br />implementation goals, but the pathway to meeting those goals is <br />subject to adaptive management and can potentially change based <br />on new information or engineering analyses performed over time. <br />The RAA output, or goals for GI implementation, attempt to identify the <br />appropriate balance in terms of detail and specificity needed to address the <br />above considerations. The RAA also considered multiple alternative scenarios <br />that can inform implementation and the adaptive management process. These <br />scenarios tested the underlining assumptions For GI implementation, and <br />demonstrate the need for further research, collaboration among multiple <br />Permittees, and incorporation of lessons learned in order to gain efficiencies <br />and maximize the cost-effectiveness of GI to reduce pollutant loads over time. <br />Four modeling scenarios were configured for this analysis (as summarized in <br />Table 1): <br />Table 1. Model scenarios objectives and cost -benefit evaluation. <br />RWC GREEN INFRASTRUCTURE PLAN <br />GREEN INFRASTRUCTURE PLAN <br />17 JUNE 2019 <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN — EXHIBIT A RESO. NO. 15780 <br />REV: 06-20-19 PR <br />MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.