My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15780
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:53 AM
Creation date
10/11/2019 8:01:47 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/24/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE GREEN INFRASTRUCTURE PLAN IN ACCORDANCE WITH PROVISION C.3.J OF THE MUNICIPAL REGIONAL PERMIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY <br />Jurisdictional <br />Each location is responsiblefor individually <br />achieving the target load reduction <br />c %T i %Reduction <br />@ <br />A I�— <br />Cost 1 <br />cost — — <br />Cost <br />a r <br />cost <br />%Reduction <br />@ <br />— Cost 2 <br />%Reduction <br />Red; <br />Cost N <br />Countywide <br />Optimization approach reduces total <br />Implementation cost by targeting specific <br />source areas across locationalhoundories <br />All Bay Cities <br />J <br />Total Cos[ % <br />(Proportional) Dptimal <br />� � Solution <br />n 0051: <br />Y, COstk » Total CostTargered <br />k=a <br />Figure 5. Modeling System Supporting the RAA. <br />Results of each of the four RAA scenarios are documented in Appendix D. <br />These results can inform the adaptive management process for GI <br />implementation, and help garner support for collaborative efforts for GI <br />implementation or further research of PCB source areas that can seek more <br />cost-effective implementation strategies over time. Figure 6, Table 2, and <br />Figure 7 provide a summary of Scenario 1 RAA results for the City of Redwood <br />City. Scenario 1 represents the most conservative scenario for GI <br />implementation. The following steps outline how the process for formulating <br />the scenario in the RAA model and using the results to set goals for GI <br />implementation. <br />First: Based on GI project categories defined in Section 2.5, SUSTAIN was used <br />to simulate effectiveness/load reductions and estimate planning -level costs <br />for various combinations of GI projects within Redwood City's jurisdiction <br />(along the x-axis of Figure 6, from low pollutant reduction/effectiveness to <br />high reduction/effectiveness). "Existing Projects" were locked in the model <br />and included those GI projects included in the FY 2016-17 MRP Annual Report <br />to the Water Board. "Future New & Redevelopment" is an estimation of the <br />LID that will likely be implemented in the future in redevelopment areas <br />(based on Provision C.3). "Green Streets" were based on prioritized and <br />ranked (High, Medium, and Low) street retrofit opportunities reported in the <br />SRP. For Redwood City, the "Regional Stormwater Capture Project at Red <br />Morton Community Park" refers to the regional project located within Red <br />Morton Park. "Other GI Projects" refer to additional GI projects needed, but <br />RWC GREEN INFRASTRUCTURE PLAN <br />GREEN INFRASTRUCTURE PLAN <br />19 JUNE 2019 <br />ATTY/RESO.0075/CC RESO APPROVING THE GREEN INFRASTRUCTURE PLAN— EXHIBITA RESO. NO. 15780 <br />REV: 06-20-19 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.