My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res00 13885
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res00 13885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:48:03 AM
Creation date
10/11/2019 9:48:02 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
4/24/2000
Description
RESOLUTION APPROVING AND ADOPTING SCHEDULE OF TRAFFIC IMPACT MITIGATION FEE PROJECTS AND SCHEDULE OF TRANSPORTATION IMPACT FEES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4/24/00 <br />(a) Traffic congestion, particularly during the "PM Peak Hours," i.e. <br />between the hours of 4 -6 p.m. has reached levels in the City of <br />Redwood City which are detrimental to the public health, welfare, <br />and safety; <br />(b) The Study describes and analyzes new street ( "street' as used <br />herein is interchangeable with "road ") improvements and <br />improvements to existing streets, including widening, extension, <br />signalization, repair, and reconstruction necessary to attain and <br />maintain an acceptable level of traffic circulation and service; <br />(c) The circulation element of the General Plan of the City likewise <br />describes necessary traffic and transportation capital improvements <br />and traffic mitigation measures for acceptable levels of service <br />corresponding to anticipated development; <br />(d) New development will generate additional traffic, necessitating the <br />acquisition of rights of way, road construction, road widening, <br />rerouting, reconfiguration, and related improvements; the <br />construction of pedestrian, bicycle, and transit improvements; and <br />implementation of traffic reduction measures; <br />(e) The transportation impact fees hereinafter approved are based <br />upon, and do not exceed, the costs of providing the aforesaid <br />improvements and traffic reduction measures necessitated by new <br />development; <br />Reso -857 2 13885 <br />F: /Shared /Redwood /Council <br />DES:rg <br />04/04/00; 04/13/0OR; 04/18/00 R <br />
The URL can be used to link to this page
Your browser does not support the video tag.