My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res03 14549
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res03 14549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:53:25 AM
Creation date
10/11/2019 9:53:20 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
8/25/2003
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE KAISER PERMANENTE REDWOOD CITY MEDICAL CENTER MASTER PLAN PROJECT FOR WHICH AN ENVIRONMENTAL IMPACT REPORT HAS BEEN PREPARED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
traffic could be inconvenienced and require detours; air quality standards could <br />be exceeded if bare soil was left exposed and construction vehicles were in <br />operation; and community noise standards may be exceeded during operation of <br />construction vehicles and equipment. (Potentially Significant) <br />Mitigation: The following mitigation measure, as set forth in the <br />Initial Study and the FEIR, is hereby adopted and will be implemented as <br />provided in the Mitigation Monitoring Program: <br />The project sponsor would be responsible for implementing <br />the following mitigation measures to reduce construction impacts during <br />improvement of the water main and replacement of distribution facilities, which <br />were included in the 1989 Proposed Second Amendment to the City of Redwood <br />City Redevelopment Plan for Redevelopment Project #2 Draft EIR to reduce the <br />severity of these impacts (the numbers represent the Mitigation Measure <br />numbers from the 1989 Proposed Second Amendment to the City of Redwood <br />City Redevelopment Plan for Redevelopment Project #2 Draft EIR). <br />• Water system improvement projects should be designed and <br />constructed to meet all criteria and standards established by <br />the Redwood City Community Development Department, the <br />Redwood City Fire Department, and the California Water <br />Works Standards. <br />The City should continue to impose its Water Conservation <br />Ordinance during periods of severe drought to maximize the <br />use of the City's water allocation from the San Francisco <br />Water Department's Hetch Hetchy aqueduct system, and to <br />conserve the City's finite water resources. <br />• Water services to the Amendment Area should meet the <br />criteria and standards used by the Redwood City Fire <br />Department to determine adequate fire protection in the <br />Amendment Area. The specific project requirements for fire <br />protection shall be determined during the plan check <br />process. <br />• Air Quality Mitigation Measures 1 to 5 of the 1989 Proposed <br />Second Amendment to the City of Redwood City <br />Redevelopment Plan for Redevelopment Project #2 Draft <br />EIR <br />• Noise Mitigation Measure 1 of the 1989 Proposed Second <br />Amendment to the City of Redwood City Redevelopment <br />Plan for Redevelopment Project #2 Draft EIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.