Laserfiche WebLink
Finding: The mitigation measure is feasible and would reduce the <br />impacts of the Project and the Higher Occupancy Scenario to less -than- <br />significant levels. <br />The mitigation measure would reduce the potential impact on air <br />quality by minimizing the amount of exposed soil and dust and by maintaining <br />equipment engines in good condition. The mitigation measure would reduce the <br />potential impact on noise by reducing engine noise and by limiting construction <br />activities to times of day when receptors are less sensitive. <br />H. Drainage Facilities <br />Potential Impact: If improvement to the drainage system is <br />necessary under the proposed project, the following construction impacts could <br />result: traffic could be inconvenienced and require detours; air quality standards <br />could be exceeded if bare soil was left exposed and construction vehicles were in <br />operation; and community noise standards may be exceeded during operation of <br />construction vehicles and equipment. <br />Mitigation: The following mitigation measure, as set forth in the <br />Initial Study and the FEIR, is hereby adopted and will be implemented as <br />provided in the Mitigation Monitoring Program: <br />The project sponsor would be responsible for the following <br />mitigation measures to reduce the severity of the construction impacts related to <br />drainage improvements to less than significant: <br />• The storm drainage improvement projects proposed under <br />the Second Amendment to the City of Redwood City <br />Redevelopment Plan for Redevelopment Project #2 should <br />be designed and constructed to meet all criteria and <br />standards established by the Redwood City Community <br />Development Department. <br />• Air Quality Mitigation Measures 1 to 5 of the 1989 Proposed <br />Second Amendment to the City of Redwood City <br />Redevelopment Plan for Redevelopment Project #2 Draft <br />EIR <br />• Noise Mitigation Measure 1 of the 1989 Proposed Second <br />Amendment to the City of Redwood City Redevelopment <br />Plan for Redevelopment Project #2 Draft El <br />• No schedule for implementation of new storm water drainage <br />facilities proposed for the Redevelopment Project #2 Area <br />has been adopted. It is expected that those improvements <br />will occur concurrent with development in the <br />