My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res03 14549
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res03 14549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:53:25 AM
Creation date
10/11/2019 9:53:20 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
8/25/2003
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE KAISER PERMANENTE REDWOOD CITY MEDICAL CENTER MASTER PLAN PROJECT FOR WHICH AN ENVIRONMENTAL IMPACT REPORT HAS BEEN PREPARED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Finding: The mitigation measure is feasible and would reduce the <br />impacts of the Project and the Higher Occupancy Scenario to less -than- <br />significant levels. <br />The mitigation measure would reduce the potential impact on air <br />quality by minimizing the amount of exposed soil and dust and by maintaining <br />equipment engines in good condition. The mitigation measure would reduce the <br />potential impact on noise by reducing engine noise and by limiting construction <br />activities to times of day when receptors are less sensitive. <br />H. Drainage Facilities <br />Potential Impact: If improvement to the drainage system is <br />necessary under the proposed project, the following construction impacts could <br />result: traffic could be inconvenienced and require detours; air quality standards <br />could be exceeded if bare soil was left exposed and construction vehicles were in <br />operation; and community noise standards may be exceeded during operation of <br />construction vehicles and equipment. <br />Mitigation: The following mitigation measure, as set forth in the <br />Initial Study and the FEIR, is hereby adopted and will be implemented as <br />provided in the Mitigation Monitoring Program: <br />The project sponsor would be responsible for the following <br />mitigation measures to reduce the severity of the construction impacts related to <br />drainage improvements to less than significant: <br />• The storm drainage improvement projects proposed under <br />the Second Amendment to the City of Redwood City <br />Redevelopment Plan for Redevelopment Project #2 should <br />be designed and constructed to meet all criteria and <br />standards established by the Redwood City Community <br />Development Department. <br />• Air Quality Mitigation Measures 1 to 5 of the 1989 Proposed <br />Second Amendment to the City of Redwood City <br />Redevelopment Plan for Redevelopment Project #2 Draft <br />EIR <br />• Noise Mitigation Measure 1 of the 1989 Proposed Second <br />Amendment to the City of Redwood City Redevelopment <br />Plan for Redevelopment Project #2 Draft El <br />• No schedule for implementation of new storm water drainage <br />facilities proposed for the Redevelopment Project #2 Area <br />has been adopted. It is expected that those improvements <br />will occur concurrent with development in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.