Laserfiche WebLink
06/07/2004 <br />including meeting housing demand and providing affordable housing, and is, therefore, <br />not be a feasible alternative to the Project. <br />F. Reduced Commercial, with Reduced Building Heights, Reduced <br />Marina Fill, Added Hotel, Improved Design, Increased Retail and <br />Incorporation of Bayfront Study Transit and Transportation Demand <br />Management (TDM) Measures (Alternative 6) <br />Description: Alternative 6 assumes that the Project site would be <br />developed as a mixed use residential - commercial complex similar to the Initial Project, <br />with the same residential unit total, but with a redesign that would include modifications <br />in building heights and building placement to substantially reduce visual impacts, an <br />increase in the amount of commercial floor area devoted to local- serving convenience <br />retail to "internalize" more vehicular trips and thereby reduce traffic impacts, the addition <br />of a 200 -room hotel, and the incorporation of additional specific transit provisions and <br />TDM measures (recommended in the City's Bayfront Study) to reduce peak period <br />vehicular trips. Accordingly, Alternative 6 would include up to1,930 condominium <br />residential units for sale (the same as the Initial Project), and a reduction in commercial <br />floor area from 312,000 square feet (the Initial Project) to 175,000 square feet, including <br />25,000 square feet of service retail (as opposed to 12,000 square feet under the Initial <br />Project). Alternative 6 would include more multi -story structures (seventeen residential <br />buildings and one hotel "tower ") than the Initial Project (thirteen towers), although the <br />maximum residential structure height would be reduced from 260 feet to 240 feet, and <br />the maximum height at the Peninsula Marina portion of the site would be further <br />reduced to 205 feet. Alternative 6 would also result in less marina fill (approximately 10 <br />acres) than the Initial Project (approximately 11.54 acres). <br />Findings: Alternatives 4, 5 and 6 are similar in number of residential units <br />(1930) and commercial (office) square footage (150,000 square feet). Alternative 6 <br />contains an additional 12,500 square feet of retail space (which, under the Project <br />Development Agreement, would have to be timely developed to permit full residential <br />development); and allows a hotel of up to 200 rooms, which would not be included in <br />the Initial Project, Alternative 4 or Alternative 5, as well as a number of significant <br />design improvements. <br />The additional retail space and development reconfiguration elements of <br />Alternative 6 are feasible measures which significantly reduce traffic generation visual <br />impacts., <br />Peak traffic for the hotel will not occur at the same times as peak traffic <br />from the rest of the Project. Therefore, inclusion of the hotel will not substantially <br />increase potential environmental impacts. The proposed hotel will also provide <br />significant economic development benefits to the City. The City has, therefore, <br />determined that incorporating features of Alternative 6, with the hotel, provides the <br />greatest feasible reduction of potential environmental impacts of any identified <br />alternative for the Project. <br />1289 \02 \179278.2 39 <br />Atty /Reso /Reso.1470 14590 <br />060804 Muff # 304 Bin 26 <br />