Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR MARINA SHORES VILLAGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
06/07/2004 <br />residential structures from 17 for the proposed Project to seven. With these limitations, <br />Alternative 8 would yield approximately 850 condominium residential units for sale and <br />approximately 203,000 square feet of commercial floor area, including approximately <br />5,000 square feet of convenience retail. Section 17.10 of the FEIR identifies Alternative <br />8 as the "environmentally superior alternative" under CEQA. <br />Findings: As compared to the Project, Alternative 8 would result in <br />substantially reduced, but still significant, environmental impacts in the areas of land <br />use, visual factors, transportation and circulation, biological resources, hydrology and <br />water quality, infrastructure and public services, soils and geology, public health and <br />safety, noise, cultural and historic resources, and air quality. With respect to population, <br />housing and employment, Alternative 8, despite having fewer new residential units than <br />the proposed Project, would nonetheless, because of the reduction in commercial <br />development, have a positive effect on the existing citywide imbalance between jobs <br />and employed residents, reducing in- commuting. Alternative 8 would, however, not <br />attain basic Project objectives identified in the discussion of the No Project Alternative <br />above, with 56 percent fewer residential units than the proposed Project (and a <br />substantial reduction in commercial retail and office floor area) and an overall scope of <br />development which would reduce Project revenue so that the Project, if financially <br />sustainable at all, could not generate sufficient revenue to provide public access, <br />waterfront features and other community - serving amenities which are fundamental, <br />identified Project objectives. Based on the foregoing and the discussion in Section 17.8 <br />of the FEIR, the City finds that, on balance, the Project provides substantially greater <br />public benefits than Alternative 8 and that Alternative 8 is not a feasible alternative to <br />the Project. <br />I. Alternative Sites <br />Description: The FEIR considered the possibility of alternative sites for <br />the Project and concluded that there are no specific sites of adequate size and general <br />character available in the Mid - Peninsula subregion where development of such a <br />project could be undertaken that would accomplish most of the basic objectives of the <br />Project and would avoid or substantially lessen the identified environmental impacts of <br />the Project as proposed. Furthermore, the project applicant owns the Peninsula Marina <br />portion of the proposed site and has a lease option to buy the Pete's Harbor portion. <br />The project applicant has no controlling interest in any other property capable of <br />meeting most of the basic objectives of the Project, nor can the applicant be reasonably <br />expected to be able to acquire or control any particular site large enough to permit such <br />a development, even if such a site could be identified, given the rarity of such sites in <br />the Mid - Peninsula area (if any exist). <br />Findings: Development of the Project at an alternative site is not feasible <br />for the reasons described above and as more fully described in Section 17.9 of the <br />FEIR. <br />1289 \02 \179278.2 41 <br />Atty /Reso /Reso.1470 14590 <br />060804 Muff # 304 Bin 26 <br />