My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res04 14590
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res04 14590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:54:01 AM
Creation date
10/11/2019 9:53:43 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
6/7/2004
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR MARINA SHORES VILLAGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IDENTIFIED IMPACT <br />this intersection is still expected to operate at <br />LOS D- -i.e., a less - than - significant impact. <br />Impact 7 -2: Project Impact on U.S. 101 <br />Southbound Mixed -Flow Lanes, Whipple <br />Avenue to Woodside Road Segment - -AM <br />Peak Hour. C /CAG's 2001 San Mateo CMP <br />Monitoring Report determined that this <br />freeway segment currently operates at LOS <br />F--i.e., existing volumes exceed the segment's <br />capacity - -in the AM peak hour. The project is <br />expected to increase volumes by more than <br />one percent of the freeway segment's <br />capacity during the AM peak hour. This effect <br />would represent a significant impact. <br />RELATED MITIGATION MEASURE <br />(CONDITION OF APPROVAL) <br />of service analysis conducted for this EIR <br />indicates that this improvement would <br />mitigate the project impact at the <br />intersection. No additional project - related <br />mitigation is necessary. <br />Mitigation 7 -2. The project shall minimize <br />impacts on this freeway segment by <br />implementing a transportation demand <br />management (TDM) program. The purpose <br />of this program would be to encourage <br />alternative travel modes to the single - <br />occupant vehicle, thereby reducing the <br />number of trips added to this freeway <br />segment and lessening this project impact. <br />As part of the proposed project, the <br />applicant is proposing to establish, in <br />cooperation with SamTrans, a shuttle bus <br />system connecting the project via downtown <br />Redwood City to the CalTrain station and El <br />Camino intraregional transit corridor <br />approximately 1.5 miles southeast of the <br />project site. Listed at the end of chapter 7 <br />(Transportation and Circulation) are other <br />TDM measures currently being considered <br />for the Marina Shores Village project as part <br />of the Bayfront Study. In consultation with <br />the City of Redwood City and City /County <br />Council of Governments of San Mateo <br />County (C /CAG), the project sponsor shall <br />design a comprehensive TDM program for <br />approval by the City and by C /CAG prior to <br />City approval of any tentative subdivision <br />map or development agreement for the <br />project. It is recommended that the TDM <br />measures implemented by the proposed <br />project be consistent with those identified for <br />residential development and employment <br />centers in the City's Bayfront Study. <br />The TDM program shall include a provision <br />for preparation by the project sponsor, and <br />review by the City or City - designated TDM <br />Legend. Applicant = project applicant, City = City of Redwood City <br />MG.... ORING <br />Impl. Type of Impl. Monitoring and <br />Entity Action Verification Entity <br />Applicant/ <br />City <br />Formulate and City <br />implement TDM <br />program (incl. <br />annual report), and <br />establish shuttle <br />bus system. <br />VERIFICm i ION <br />Timing Signature Date <br />construction of <br />improvement <br />prior to project <br />occupancy <br />Formulate <br />program prior to <br />tentative map/ <br />development <br />agreement <br />approval; annual <br />City review of <br />TDM program <br />annual report <br />continuing for <br />five years after <br />full project <br />buildout <br />Page 13 May 18, 2004 <br />y WP9.016451 MMCHT.645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.