My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res05 14639
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res05 14639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:54:41 AM
Creation date
10/11/2019 9:54:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
4/25/2005
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING MITIGATION MONITORING AND REPORTING EFFORTS, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE COURTHOUSE FAQADE RECONSTRUCTION AND PLAZA PROJECT FOR WHICH AN ENVIRONMENTAL IMPACT REPORT HAS BEEN PREPARED.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4/25/2005 <br />Mitigation: The following mitigation measure, as set forth in the FEIR, is hereby <br />adopted and will be implemented as provided in the mitigation monitoring and reporting <br />effort: <br />No disturbance of archaeological nature is anticipated at the Project site <br />since the Plans show that excavation will not occur deeper than the <br />existing building footings of the South Annex. The sole area which has the <br />potential for undisturbed soil is the "hyphen" or building connection <br />between the South Annex and the Courthouse. Further archival and field <br />study and monitoring (as needed) by a qualified archaeologist will be <br />required to address the presence (or lack thereof) of archaeological <br />resources in conformance with the Standards and the City- adopted <br />Cultural Resources Management Plan. <br />Monitoring: Prior to City Council consideration of the Project, staff hired a <br />qualified archeologist who submitted additional documented evidence that confirmed <br />that Project excavation would not result in an impact on archeological resources. Staff <br />has secured an agreement with a qualified archeologist whose presence on site during <br />excavation of the "hyphen" between the South Annex and the old Courthouse will be <br />coordinated by staff in conformance with the Standards and City- adopted Cultural <br />Resources Management Plan. <br />Finding: The mitigation measure is feasible and would reduce the impacts of the <br />Project to less- than - significant levels because the measure would conform to the <br />Standards and the City's Cultural Resources Management Plan relating to the treatment <br />of such historic resources. <br />Atty /Reso /Reso.1530 14639 <br />042005 7 Muff # 301 <br />
The URL can be used to link to this page
Your browser does not support the video tag.