My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res05 14639
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res05 14639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:54:41 AM
Creation date
10/11/2019 9:54:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
City Council
Date
4/25/2005
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING MITIGATION MONITORING AND REPORTING EFFORTS, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE COURTHOUSE FAQADE RECONSTRUCTION AND PLAZA PROJECT FOR WHICH AN ENVIRONMENTAL IMPACT REPORT HAS BEEN PREPARED.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4/25/2005 <br />FINDINGS CONCERNING PROJECT ALTERNATIVES <br />An EIR must describe a range of reasonable alternatives to a project, or the <br />location of a project, which would feasibly obtain most of the basic objectives of a <br />project, but would avoid or substantially lessen any of the significant environmental <br />effects of a project, and evaluate the comparative merits of the alternatives. Even if a <br />project alternative will avoid or substantially lessen any of the significant environmental <br />effects of a project, the decision -maker may reject the alternative if it determines that <br />specific considerations make the alternative infeasible. The City Council has not yet <br />approved the Project. For the reasons identified in the attached resolution and as <br />supported by the evidence in the record, Alternative #3 constitutes the Project. The <br />findings with respect to alternatives identified in the FEIR are described below. <br />A. NO- PROJECT ALTERNATIVE ( #1) <br />Description of Alternative: Under the No- Project Alternative, no new <br />development would occur at the Project site and demolition would be not triggered. <br />Findings: This alternative would preserve existing conditions on the Project site, <br />and no Project approvals would be adopted by the City. Existing facilities which are <br />currently vacant would remain in their present condition and require increased <br />maintenance. The City finds that this alternative is infeasible and less desirable than <br />the proposed Project and rejects this alternative for the following reasons: <br />1. This alternative would forgo the opportunity to strengthen cultural, visual <br />and pedestrian connections within the downtown environment including re- establishing <br />a visual link with the Theater located directly in front of the Courthouse which is <br />currently used as a regional museum. <br />2. This alternative would forgo the opportunity to restore the original front <br />facade to a historically significant major community landmark listed on the National <br />Register which is listed as one of the goals and objectives of the historic element of the <br />City General Plan. <br />Based on the foregoing, the City finds that, on balance, the Project is preferable <br />to the No- Project Alternative and that the No- Project Alternative is not a feasible <br />alternative to the Project. <br />B. THE RECONSTRUCTION OF THE PORTICOISTEPS AND PLAZA DESIGN <br />ALTERNATIVE ( #2) <br />Description of Alternative: The proposal involves restoring the Courthouse <br />fagade to its original appearance by reconstructing the entrance columned portico and <br />steps. Specific elements of the Courthouse are to be reconstructed to closely resemble <br />their 1910 appearance and location. The specific number and materials for the major <br />elements to be reconstructed on each fagade are listed in the FEIR. This alternative is <br />Atty /Reso /Reso.1530 14639 <br />042005 8 Muff # 301 <br />
The URL can be used to link to this page
Your browser does not support the video tag.