My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res07 14769
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2000-2009
>
Res07 14769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 9:56:07 AM
Creation date
10/11/2019 9:55:53 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
3/26/2007
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING CERTAIN FINDINGS CONCERNING MITIGATION MEASURES, ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM, MAKING FINDINGS CONCERNING ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS IN ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE REDWOOD CITY DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
03/27/2007 <br />and noise levels generated by construction are prohibited on Saturdays, <br />Sundays, and holidays. (Redwood City Municipal Code Section 24.30) <br />• Construction Equipment Mufflers and Maintenance. Equip all internal <br />combustion engine-driven equipment with intake and exhaust mufflers that <br />are in good condition and appropriate for the equipment. <br />• Equipment Locations. Locate stationary noise-generating equipment as far as <br />possible from sensitive receptors when sensitive receptors adjoin or are near <br />a construction project site. <br />• Construction Traffic. Route all construction traffic to and from the construction <br />sites via designated truck routes where possible. Prohibit construction-related <br />heavy truck traffic in residential areas where feasible. <br />• Quiet Equipment Selection. Use quiet construction equipment, particularly air <br />compressors, wherever possible. <br />• Temporary Barriers. Construct solid plywood fences around construction sites <br />adjacent to residences, operational businesses, or noise-sensitive land uses. <br />• Temporary Noise Blankets. Temporary noise control blanket barriers should <br />be erected, if necessary, along building facades of construction sites. This <br />mitigation would only be necessary if conflicts occurred which were <br />irresolvable by proper scheduling. (Noise control blanket barriers can be <br />rented and quickly erected.) <br />• Noise Disturbance Coordinator. For larger construction projects, the City may <br />choose to require project designation of a "Noise Disturbance Coordinator" <br />who would be responsible for responding to any local complaints about <br />construction noise. The Disturbance Coordinator would determine the cause <br />of the noise complaint (e.g., starting too early, bad muffler, etc.) and institute <br />reasonable measures to correct the problem. Conspicuously post a telephone <br />number for the Disturbance Coordinator at the construction site and include it <br />in the notice sent to neighbors regarding the construction schedule. (The <br />project sponsor should be responsible for designating a Noise Disturbance <br />Coordinator, posting the phone number, and providing construction schedule <br />notices. The Noise Disturbance Coordinator would work directly with an <br />assigned City staff member.) <br />Finding: Implementation of these measures would reduce this <br />intermittent, short-term, project construction-period noise impact to a less-than- <br />significantlevel. <br />Impact 11-2: Precise Plan-Facilitated Ground-Borne Vibration Levels. <br />Precise Plan implementation related individual project demolition and <br />construction activities could generate substantial vibration (e.g., from potential <br />pile driving) in the project vicinity. These possible intermittent and short-term <br />effects represent a potentially significant impact (see criterion 2 and <br />explanatory text in subsection 11.3.1, "Significance Criteria," above). <br />Mitigation 11-2. Reduce ground-borne vibration levels during individual, <br />site specific future project demolition and construction periods by incorporating <br />Atty/Reso/Reso.1683 26 14769 <br />030707 Muff #613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.