Laserfiche WebLink
<br />EXHIBIT "A" <br /> <br />1968 Election <br /> <br />MEASURES SUBMITTED TO VOTE OF VOTERS <br /> <br />MEASURE (A): Shall Redwood City General <br />(Reclamation and Improvement District No. 1-6~ <br />Draina~e Project) incur a general obliRation <br />bonded indebtedness in the <br />principal amount of $23,508,000 for the acqui- <br />sition, construction, improvement, maintenance <br />and operation of the following district project, <br />to wit: Reclamation and Drainage Project com- <br />prising (a) preparation works, including cleanin~ <br />out or depressions and slo~ghs in areas to be <br />filled and disposition of unsuitable materials; <br />excavation of ponding basins and waterways; excava- <br />tion, gradin~, preparation and leveling with <br />on-site material of surface of areas to be filled; <br />and excavation of existing waterways and use of <br />excavated material as fill in specified areas or <br />disposition of same ir unsuitable; (b) levee <br />works, including construction, reconstruction, <br />or removal of levees; construction of levee facln~ <br />or levee protection works; construction of jetties <br />or dams for harbors or for controlled level water- <br />ways; (c) fill and gradln~ works, includin~ exca- <br />vation, transportation, placing, gradin~ and com-, , <br />pacting of fill; and placin~ and removal of <br />imported fill surcharges where needed; (d) drain- <br />age system works, including construction of storm <br />drainage collection systems, canals and appurten- <br />ant facilities, treatment of slopes and instal- <br />lation of drainage structures to protect adjacent <br />lands; (e) pump and dischar~e works, including <br />construction of drainage pumping and dischar~e <br />facilities; (f) control system works, includin~ <br />construction of drainage control structures, tide ,-' <br />gates and appurtenances; installation or construc- <br />tion of water level control structures and appur- <br />tenances; and construction or installation of con- <br />trol systems to coordinate pumpin~ stations and <br />control structures; (g) lands, rights-of-way and <br />easements for any or all of said works; and (h) <br />other works, property or structures necessary or <br />convenient for said project? <br /> <br />-1- <br /> <br />YES <br /> <br />NO <br />