Laserfiche WebLink
<br />885 Woodside Road Precise Plan - Mitigation Monitoring and Reporting Checklist (cont'd) <br /> <br />.,ITPI~~~~~~~~~:m <br /> <br />Design and <br />construction <br /> <br />Design and <br />construction <br /> <br />Design and <br />construction <br /> <br /> <br />Hydrology <br />and Water <br />Quality <br /> <br />Hydrology <br />and Water <br />Quality <br /> <br />Hydrology <br />and Water <br />Quality <br /> <br />Water <br />Conservation <br /> <br />Contamination <br /> <br />Storm <br />Drainage <br /> <br />BAGG, including shoring for all excavations near <br />property boundaries and installation of a two-way <br />reinforced basement level mat to mitigate the <br />projected differential settlements. <br /> <br />[Mitigation Measure 6-1 of the <br />IS/MND/Addendum) <br /> <br />Mitigation Measure 5: The applicants shall be <br />required to follow the City of Redwood City's <br />Water Conservation Program, which includes all <br />of the Best Management Practices identified in <br />the Memorandum of Understanding (MOU) <br />Regarding Urban Water Conservation as <br />overseen by the California Urban Water Council. <br /> <br />[Mitigation Measure 8-1 of the <br />IS/MND/Addendum] <br /> <br />Mitigation Measure 6: A revised plan shall be <br />submitted for review in which there is a <br />prohibitive barrier for vertical infiltration of <br />contaminated vapors to residential floors of the <br />proposed building. <br /> <br />[Mitigation Measure 8-2 of the <br />IS/MND/Addendum] <br /> <br />Mitigation -Measure 7: A revised drainage plan <br />shall be submitted for review and approval by <br />Engineering and Construction prior to issuance <br />of grading or building permits. The drainage <br />revisions shall include the following: <br /> <br />a. Storm drains with a filtration system to clean <br />water before displacing it <br /> <br />b. Grade and sub-grade level parking with a <br />labeled method for water drainage. <br /> <br />c. A calculation of the existing quantity of storm <br />water run off and plans for maintaining the <br />existing rate of runoff project's construction <br /> <br />d. The building's foundation shall be constructed <br />to inClude under round barriers or <br /> <br />p, <br />"1 <br />the City by the project sponsor prior <br />to building permit issuance. <br />Implemented by the project <br />sponsor/contractor during project <br />construction, <br /> <br />Redwood City's Water Conservation <br />Program provisions to be <br />incorporated into building plans to be <br />submitted to the City by the project <br />sponsor prior to building permit <br />issuance. Implemented by the project <br />sponsor/contractor during project <br />construction. <br /> <br />A protective vapor barrier shall be <br />incorpOrated into building plans to be <br />submitted to the City by the project <br />sponsor prior to building permit <br />issuance. Implemented by the project <br />sponsor/contractor during project <br />construction. <br /> <br />Drainage Plan to be submitted to the <br />City by the project sponsor prior to <br />building permit issuance. <br />Implemented by the project <br />sponsor/contractor during project <br />construction. <br /> <br />City Building Division <br /> <br />City Building Division <br /> <br />City Engineering and <br />Construction <br /> <br />'"U <br />Q) <br />(Q <br />CD <br />~-....J <br />CJ1)> <br />