Laserfiche WebLink
<br />885 Woodside Road Precise Plan - Mitigation Monitoring and Reporting Checklist (cont'd) <br /> <br />;'lrl"iplem <br />..!!;i!.ii':,Ph <br /> <br /> <br />,~~~~~~!~;r~I~~ ! <br /> <br />Construction <br /> <br />Noise <br /> <br />Construction <br />Noise <br /> <br />mechanical systems to prevent lateral and <br />vertical infiltration of contaminated <br />groundwater from the adjacent property to <br />permeate the storm drains <br /> <br />[Mitigation Measure 8-3 of the <br />IS/MND/AddendumJ <br /> <br />Mitigation Measure 8: The following <br />construction noise control measures are <br />recommended to limit the amount of noise <br />generated during the construction period. These <br />measures would mitigate the impact to a less <br />than significant level: <br /> <br />a. Limit construction to daytime hours (7:00 am <br />to 8:00 pm) Monday through Friday, with no <br />construction activities on Weekends or <br />holidays per Sec. 24.32 of the City of <br />Redwood City Municipal Code. <br /> <br />b. Construction activities or equipment shall not <br />generate noise levels exceeding 110 dBA per <br />Sec. 24.31 of the City of Redwood City <br />Municipal Code. <br /> <br />c. Utilize "quier models of air compressors and <br />other stationary noise sources where <br />technology exists. <br /> <br />d. Prohibit unnecessary idling of internal <br />combustion engine. <br /> <br />e. Equip all internal combustion engine driven <br />equipment with intake and exhaust mufflers <br />that are in good condition and appropriate for <br />the equipment. <br /> <br />f. Locate stationary noise generating equipment <br />as far as possible from noise sensitive <br />receptors. <br /> <br />g. Designate a noise disturbance coordinator <br />who would be responsible for responding to <br />any local complaints about construction <br />noise. The disturbance coordinator would <br />determine the cause of the noise com taints <br /> <br />Implemented by the project <br />sponsor/contractor during project <br />construction. <br /> <br /> <br />City Building Division <br /> <br />"'U <br />Q) <br />(Q <br />CD <br />....Jo. -.....r <br />0>)> <br />