Laserfiche WebLink
<br />885 Woodside Road Precise Plan. Mitigation Monitoring and Reporting Checklist (cont'd) <br /> <br />.';I'~~!~~I~, <br /> <br /> <br />Design and <br />construction <br /> <br />Design and <br />construction <br /> <br />Noise <br /> <br />Utilities <br />and <br />Service <br />Systems <br /> <br />Interior Noise <br />Levels <br /> <br />Water <br />Conservation <br /> <br />(e.g., starting too early, bad muffler, etc.) and <br />institute reasonable measures warranted to <br />correct the problem. Conspicuously post a <br />telephone number for the disturbance <br />coordinator at the construction site. <br /> <br />[Mitigation Measure 11-1 of the <br />IS/MND/Addendum] <br /> <br />Mitigation Measure 9: The California Building <br />Code requires project-specific acoustical <br />analyses to achieve interior noise levels of 45 <br />dBA CNEL or lower in residential units exposed <br />to exterior noise levels greater than 60 dBA <br />CNEL. Building sound insulation requirements <br />would need to include the provision of forced-air <br />mechanical ventilation in noise environments <br />exceeding 60 dBA CNEL, so that windows could <br />be kept closed at the occupant's discretion to <br />control noise. Special building construction <br />techniques (e,g., sound-rated windows and <br />building facade treatments) may be required <br />where exterior noise levels exceed 65 dBA <br />CNEL. These treatments include, but are not <br />limited to sound rated windows and doors, sound <br />rated exterior wall assemblies, acoustical <br />caulking, etc. The specific determination of what <br />treatments are necessary will be conducted on a <br />unit-by-unit basis during project design. Results <br />of the analysis, including the description of the <br />necessary noise control treatments, will be <br />submitted along with the building plans and <br />approved prior to issuance of a building permit. <br /> <br />[Mitigation Measure 11-2 of the <br />IS/MND/Addendum] <br /> <br />Mitigation Measure 10: The applicants shall be <br />required to follow the City of Redwood City's <br />Water Conservation Program, which includes all <br />of the Best Management Practices identified in <br />the Memorandum of Understanding (MOU) <br />Re ardin Urban Water Conservation as <br /> <br />Adequate sound attenuation features <br />shall be incorporated into building <br />plans to be submitted to the City by <br />the project sponsor prior to building <br />permit issuance. Implemented by the <br />project sponsor/contractor during <br />project construction. <br /> <br />Redwood City's Water Conservation <br />Program provisions to be <br />incorporated into building plans to be <br />submitted to the City by the project <br />sponsor prior to building permit <br />issuance. 1m lemented b the ro'ect <br /> <br />City Building Division <br /> <br />City Building Division <br /> <br />"U <br />Q) <br /><C <br />CD <br />...Jo. -.....J <br />-.....J)> <br />