Laserfiche WebLink
<br />885 Woodside Road Precise Plan. Mitigation Monitoring and Reporting Checklist (cont'd) <br /> <br /> <br />Design and <br />construction <br /> <br />Utilities <br />and <br />Service <br />Systems <br /> <br />[Mitigation Measure 16-1 of the <br />IS/MND/Addendum] <br /> <br />Mitigation Measure 11; A storm drainage plan <br />and site drainage plan shall be submitted to <br />Engineering and Construction to mitigate <br />potential impacts of storm water run-off and to <br />ensure adequate accommodation of on-site and <br />off-site drainage. <br /> <br />Storm <br />Drainage <br /> <br />[Mitigation Measure 16-2 of the <br />IS/MND/Addendum] <br /> <br />.___._.........-.L-.-._ <br /> <br />- - <br />Drainage Plan to be submitted to the <br />City by the project sponsor prior to <br />building permit issuance. <br />Implemented by project <br />sponsor/contractor during project <br />construction. <br /> <br />City Engineering and <br />Construction <br /> <br />""U <br />D) <br />(0 <br />CD <br />~-.....J <br />(X))> <br />