My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res84 9635
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
1980-1989
>
Res84 9635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 1:40:13 PM
Creation date
10/11/2019 1:40:13 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
7/23/1984
Description
DCB:sah 7/24/84R RES 0 L UTI 0 N N O. RD- 84-6 DUPLICATE ORIG'~\:f~1 I llu, , ~ JUL ~;) 1~tj4 RES 0 L UTI 0 N N O. 9635 CONCURRENT RESOLUTION OF THE COUNCIL OF REDWOOD CITY AND REDEVELOPMENT AGENCY OF THE CITY OF REDWOOD CITY AUTHORIZING EXECUTION OF AN AMENDMENT TO THE AGREEMENT BETWEEN THE REDEVELOPMENT AGENCY OF THE CITY OF REDWOOD CITY, THE CITY OF REDWOOD CITY, AND LINCOLN PROPERTY COMPANY NO. 388 CONCERNING SEAPORT BOULEVARD BE IT RESOLVED BY THE COUNCIL OF THE CITY OF REDWOOD CITY, AND BY THE COUNCIL OF THE CITY OF REDWOOD CITY ACTING AS THE REDEVELOPMENT AGENCY OF THE CITY OF REDWOOD CITY, AS FOLLOWS: 1. Section of l{a) of the Agreement between the Redevelopment Agency of the City of Redwood City, the City of
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DCB:rks <br />DCB:rks <br />DCB:rks <br />DCB:sah <br /> <br />to Charley Brown's). The Project shall also <br /> <br />include necessary undergrounding of utilities and <br /> <br />any required acquisition of right-of-way or <br /> <br />relocation of facilities owned by P.G.& E. The <br /> <br />Project <br /> <br />shall <br /> <br />be <br /> <br />all <br /> <br />those <br /> <br />costs <br /> <br />costs <br /> <br />necessarily <br /> <br />incidental <br /> <br />public <br /> <br />work <br /> <br />to <br /> <br />a <br /> <br />construction project, including, but not limited <br /> <br />to, <br /> <br />engineering <br /> <br />contract <br /> <br />design, <br /> <br />and <br /> <br />administration, <br /> <br />actual <br /> <br />construction <br /> <br />inspection. <br /> <br />The proj ect shall include all items listed <br /> <br />on Exhibit "A", attached hereto and incorporated <br /> <br />herein by this reference, but the actual cost of <br /> <br />these items, as listed in Exhibit "A", shall not <br /> <br />be reimbursed to Seaport. <br /> <br />The Project shall not include the cost of <br /> <br />Traffic Signalization at the intersections of <br /> <br />Bloomquist Street and Seaport Court with Seaport <br /> <br />Boulevard, <br /> <br />but shall include all costs of <br /> <br />underground <br /> <br />preparation <br /> <br />conduit, <br /> <br />including <br /> <br />wiring, and related work for such traffic signal <br /> <br />and railroad crossing protection devices as <br /> <br />contained in those plans entitled "Reconstruction <br /> <br />of Seaport Boulevard Station 5 + 24.48 to Station <br /> <br />2 <br /> <br />7/05/84 <br />7/20/84R <br />7/23/84R <br />7/24/84R <br /> <br />and <br />
The URL can be used to link to this page
Your browser does not support the video tag.