My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res84 9675
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
1980-1989
>
Res84 9675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 1:40:28 PM
Creation date
10/11/2019 1:40:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
8/27/1984
Description
RES 0 L UTI 0 N N O. 9675 AUG 2 7 1984 RESOLUTION REJECTING ALL BIDS FOR THE SEAPORT BOULEVARD PHASE II RECONSTRUCTION PROJECT; DIRECTING RETURN OF SECURITY DEPOSITS; AND DIRECTING STAFF TO REDESIGN THE PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />JCB:rb 8/23/84 <br /> <br />3. The Director of Public Works is hereby directed to <br /> <br />redesign the project including, but not limited to, taking into <br /> <br />consideration all possible savings which could result from the <br /> <br />redesign of the storm drainage system and designing environmental <br /> <br />mitigation measures required by the federal agencies <br /> <br />* <br /> <br />* <br /> <br />* <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.