My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord04 2264
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
Ordinances
>
2000-2009
>
Ord04 2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 2:59:00 PM
Creation date
10/11/2019 2:58:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
6/28/2004
Description
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY, ADOPTING THE MARINA SHORES VILLAGE PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ! <br /> í <br /> Chapter III - Circulation, Transportation & Capital Improvements <br /> <br /> ! above, to provide access to development on the west side of e. Recycled Water - All non-residential structures or spaces <br /> ¡ Bair Island Road. At some point in the future, this crossing shall be dual-plumbed for indoor use of recycled water <br /> , could be relocated to align with the "scenic entrance drive" for toilet flushing and applicable, self-contained cool- <br /> i <br /> I intersection concept contained in the Bayfront Study ing systems. Such plumbing shall be separate from po- <br /> I table plumbing and shall be served by separate recycled <br /> I E. Utilities and Services - Major facilities are summarized below. water meters, in full compliance with SB 2095 require- <br /> Additional information and detail is provided in supplemental ments and plumbing codes. <br /> 1 reports, including the Marina Shores Village Project Draft ElR. Ad- <br /> i <br /> ditional requirements may be added as part of conditions of All exterior landscaping and decorative water features <br /> ~ J approval, prior to approval of a development permit or final shall be designed for the use of recycled water in full <br /> I map, and/or per other City procedures compliance with California Title 22 requirements, and <br /> shall be served by recycled water meters which are sepa- <br /> I 1. Water Service rate from indoor recycled water meters and all potable <br /> water meters. <br /> I a. Water Supply - The City will enter the full amount of <br /> the estimated project water demand into the City of f. Landscaping - shall conform to city water conservation <br /> I Redwood City's water supply planning process, but the guidelines. <br /> City retains full discretion in the allocation of water sup- <br /> ply. The adequacy of the water supply to serve indi- 2. Sewer Service <br /> vidual, subsequent project phases will be determined at <br /> the time of issuance of building permits. a. Treatment and Transmission Capacity - The City will <br /> I purchase SBSA dry weather flow treatment capacity and <br /> I b. Emergency Storage and Fire Protection - Build and dedi- shall be reimbursed by Precise Plan Area development. <br /> cate City water tank(s), associated pump station and The SBSA Influent lift Station and Maple Street Pump <br /> I tank site to serve the project. Station should be upgraded to increase transmission <br /> capacity. <br /> I c. Water Distribution - Build new water distribution sys- <br /> tem, within project site and from project site to supply b. Local Collection System - Construct on-site sewer col- <br /> .., lines on the west side of US 101. Provide necessary pipe lection system and pump station, and convey to the <br /> J upgrade/improvement in the area of Main and Conven- treatment plant by pumping to the SBSA 48-inch sewer <br /> tion to ensure proper flow. system force main. The on-site sewer collection system <br /> I will be privately owned and maintained. The pump sta- <br /> d On-Site Water and Fire Protection System - Shall be City- tion and force main will be owned and maintained by <br /> I owned and City-maintained, with appropriate ease- the City. <br /> I ments provided for construction and maintenance ac- <br /> cess. <br /> J <br /> - 73 - Final Plan - June 2004 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.