My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord08 2331
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
Ordinances
>
2000-2009
>
Ord08 2331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 3:00:14 PM
Creation date
10/11/2019 3:00:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
6/9/2008
Description
ORDINANCE NO. 2331 ORDINANCE ADDING CHAPTER 38, ARTICLE VII TO THE MUNICIPAL CODE OF THE CITY OF REDWOOD CITY RELATING TO THE CROSS CONNECTION CONTROL PROGRAM ORDINANCE THE COUNCIL OF THE CITY OF REDWOOD CITY DOES ORDAIN AS FOLLOWS: Section 1. Municipal Code Amendment. Article VII is hereby added to Chapter 38 of the City Code of the City of Redwood City to read as follows: "Article VII. CROSS CONNECTION CONTROL Sec. 38.30 Purpose The City of Redwood City has a responsibility of protecting the public water supply from contamination occurring through backflow. This can only be achieved by implementing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
06/09/2008 <br /> sewage pumping stations, chemical manufacturing plants, <br /> hospitals, mortuaries, and plating plants. <br /> c. In the case of any premises where there are cross connections, <br /> either actual or potential. <br /> d. In the case of any premises where, because of security <br /> requirements or other prohibitions or restrictions, it is impossible or <br /> impractical to make a complete in-plant cross connection survey. <br /> 2. In the case of any premises where there is water or substance that would <br /> be objectionable but not hazardous to health, if introduced into the public <br /> water system, the public water system shall be protected by an approved <br /> double check valve assembly. <br /> 3. In the case of any premises where, in the opinion of the Director, an <br /> undue health threat is posed because of the presence of extremely toxic <br /> substances, the Director may require an air gap at the service connection <br /> to protect the public water system. This requirement will be at the <br /> discretion of the Director and is dependent of the degree of hazard. <br /> Sec. 38.39 Installation of Backflow Prevention Assemblies: <br /> A. Where Backflow Prevention Assembly Are Required <br /> In addition to the requirements of Article VII (Plumbing Code) of Chapter 9 of this <br /> Code and all amendments thereto, an approved backflow prevention assembly <br /> shall be installed on each service line to a customer-user's water system at or as <br /> near possible the terminal end of the service connection from the City water <br /> system or immediately inside the building being served; but in all cases, before <br /> the first branch line leading off the service line. <br /> B. Installation and Permits <br /> Every backflow prevention assembly installed for the purpose of eliminating a <br /> cross-connection shall be so installed with all applicable City permits, in <br /> accordance with City standards, and at a location approved by the Director. The <br /> approval required hereunder shall be in addition to all applicable requirements of <br /> Title 17 of the California Administrative Code and Article VII (Plumbing Code) of <br /> Chapter 9 of this Code and all amendments thereto. <br /> Section 38.40 Testing of Backflow Prevention Assemblies: <br /> A. Customer-User Responsibilities: The customer-user shall have the following <br /> responsibilities <br /> ATTY/ORD/ORD.305 ORD.2331 <br /> 041608 6 FORMERLY MUFF#802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.