Laserfiche WebLink
Remodeling with Street Frontage of 200 feet or more a new street light shall be <br />installed, if needed, as determined by Engineering and Construction. <br /> <br /> Section 18.241 STREET IMPROVEMENTS (STREET TREES): Upon the <br />construction of a New Building or the performance of Substantial Commercial <br />Remodeling, or when sidewalks are replaced or repaired, on the Street Frontage, as <br />required by this Ordinance, four (4) foot square street tree wells shall be dug, grates <br />and frames shall be installed, and 24-inch box trees planted every 30 feet on average <br />for the entire length of Street Frontage, except at driveways. The tree grate and tree <br />well shall conform to the City's Engineering Standard. Irrigation shall be provided to <br />each tree well unless exempted by the City in writing. The type of tree shall be <br />specified by the City and the property owner will be responsible for watering the tree. <br /> <br /> This street tree requirement shall be imposed on the following streets: <br /> <br /> · El Camino Real (Entire length within Redwood City) <br /> · Woodside Road (Entire length where access is allowed, not along the <br /> expressway) <br /> · Broadway (1400 through 1800 block and 2700 block) <br /> · Arguello Street (400-600 block) <br /> · Perry Street (00 block) <br /> · California Street (00-100 block) <br /> · Brewster Avenue (500-1000 block) <br /> · Fuller Street (200-400 block) <br /> · Bradford Street (200-300 block, 600-800 block) <br /> · Marshall Street (200-800 block) <br /> · Winslow Street (00-800 block) <br /> · Middlefield Road (400-700 block) <br /> · Jefferson Avenue (500-1100 block) <br /> · Main Street (400-1600 block) <br /> · Veterans Boulevard (400-1400 block) <br /> · Whipple Avenue (500-900 block) <br /> · James Avenue (00 block) <br /> · Allerton Street (500-600 block) <br /> · Spring Street (Main Street to Maple Street) <br /> · Warren Street (400-600 block) <br /> <br /> -4- 2153 <br /> <br /> <br />