My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 City of Menlo Park
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 City of Menlo Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:31:45 PM
Creation date
10/18/2019 3:06:25 PM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Streambed Alteration Agreement , includes but not limited to vegetation and trash and debris removal from Atherton Channel
RMP File Number
304
Date
10/11/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scheduling and Hours <br />The City of Menlo Park shall initiate scheduling with the Contractor each year. The City of <br />Menlo Park shall provide the Contractor with as much advance notice as possible to arrange for <br />personnel and equipment. <br />The period in which to conduct project activities shall follow the timeline specified in the SAA. <br />The allowable working hours will be 9:00 AM to 3:00 PM on weekdays, 6:00 AM to 6:00 PM on <br />weekends, except where otherwise specified by the City of Menlo Park. Project activities shall <br />span between four (4) to six (6) working days each year, depending on site conditions. Working <br />days are anticipated to be between ten (10) and twelve (12) hours in length. <br />2. Payment Terms <br />The Contractor shall provide the services outlined herein on an hourly basis not to exceed <br />$135,000 for the length of the agreement, or an annual amount delineated in the table below. <br />Fees will be billed based on actual hours worked and equipment used per the labor rate schedule <br />and equipment schedule delineated below. <br />Lahor Rates <br />Classi ication <br />How -4, Rate <br />Administrative Oversight <br />$189 <br />Lead PW Maintenance Worker <br />$189 <br />Equipment Oerator <br />$189 <br />PW Maintenance Worker <br />$189 <br />Equipment Rates <br />The Contractor's equipment will be billed according to the Caltrans Equipment Rental Rates and <br />Labor Surcharge fee schedule for the time period in which work activities are performed. <br />Caltrans rental rates are available online at http://www.dot.ca.�lov/hq/construe/equipmnt.html. <br />Anticipated equipment include: <br />(1) Clamshell bucket <br />• (1) 10 Ton Telescopic Crane <br />• (1) Utility Truck <br />• (4) Hedge/Brush Trimmers <br />Maximum Annual Amount <br />Fiscal Year <br />Maximum Annual Amount <br />2019-2020 <br />$45,000 <br />2020-2021 <br />$45,000 <br />2021-2022 <br />$45,000 <br />REV: 09-19-19 EI <br />ATTY/AGR.2019.250/City of Redwood City (Page 9 of 34) <br />
The URL can be used to link to this page
Your browser does not support the video tag.