My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 City of Menlo Park
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 City of Menlo Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:31:45 PM
Creation date
10/18/2019 3:06:25 PM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Streambed Alteration Agreement , includes but not limited to vegetation and trash and debris removal from Atherton Channel
RMP File Number
304
Date
10/11/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Due to site constraints, traffic control will be required. The City of Menlo Park shall provide <br />traffic control devices (e.g. cones, barricades, warning signs, etc.) and other incidentals to control <br />automobile traffic safety around the sites. The City of Menlo Park shall close the sidewalk next <br />to the Channel and re -direct pedestrian traffic while work is in progress. The Contractor shall <br />handle worksite safety and work equipment traffic control if it is required, which shall comply <br />with all City of Menlo Park standards. Construction operations shall be conducted in such a <br />manner to cause as little inconvenience to vehicle and pedestrian traffic as possible. <br />The Contractor shall follow all City of Menlo Park NPDES requirements and Best Management <br />Practices (e.g. straw or fiber rolls, storm drain filters) to keep miscellaneous litter and trash out <br />of the Channel and storm drains during work activities. The Contractor shall keep the work area <br />and right-of-way clean of debris from project activities. After removal of spoils, the Contractor <br />shall leave the area in as clean a condition as it was before the work. <br />Disposal of materials removed from the Channel and banks shall be arranged by the City of <br />Menlo Park. <br />The Contractor shall provide access to toilet facilities for its workers. There are no public <br />facilities near the work site. <br />Regulatory Provisions <br />The City of Menlo Park will provide Contractor personnel with site specific trainings necessary <br />to perform work under the SAA. The City of Menlo Park will also arrange for any monitoring <br />services (e.g. biological monitor) as required by the SAA. <br />Equipment <br />The Contractor shall provide the necessary equipment (e.g. hand tools and a ten ton telescopic <br />crane truck with a clamshell bucket) for the project. The City of Menlo Park shall provide five <br />yard dump trucks for vegetation and debris removal from job site. However, in the event of an <br />unforeseen equipment failure such that the annual flood control maintenance cannot be <br />completed prior to October 31 of that year, Contractor shall notify City of Menlo Park, and at the <br />discretion of the City of Menlo Park, there will be three alternatives to completing the project: <br />• The City of Menlo Park shall cover the cost of renting replacement equipment for <br />Contractor's use, or <br />• The City of Menlo Park shall pay for all services that were provided by the Contractor, <br />and the City of Menlo Park will assume responsibility for completing the remainder of <br />the project through other means, or <br />• After the Contractor is able to assess the extent of the equipment failure and provide an <br />estimated timeline for repair or replacement, City of Menlo Park shall seek an extension <br />approval from California Department of Fish and Wildlife so that the project can be <br />completed by the Contractor, given this timeline is agreeable with the needs of the City of <br />Menlo Park. <br />REV: 09-19-19 EI <br />ATTY/AGR.2019.250/City of Redwood City (Page 8 of 34) <br />
The URL can be used to link to this page
Your browser does not support the video tag.