My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7C <br /> Genera[ Plan was amended and the land use designation was changed to Page 7 <br /> Office/Commercial — Mixed Use (Commercial and Residential}. As indica#ed above, this <br /> portion of the MSV project was not subject to the voter referendum; therefore, the <br /> Peninsula Park project is consisten# with the current General Plan designation of <br /> Office/Commercial — Mixed Use Residential. <br /> The Land Use element of the General Plan lists the first objective as "protect the <br /> integrity of existing single-family areas, and encourage home ownership in new <br /> development." As proposed, the Peninsula Park projec# achieves this objective by <br /> incorporating 796 ownership units on an existing urban infill site. By developing on an <br /> urban infill site the project would serve as an anchor for an emerging mixed use <br /> neighborhood with a variety of multi-family housing options; thereby accommodating <br /> much needed housing �hile allowing for the preservation of existing single-family <br /> residential neighborhoods. <br /> The Peninsula Park project also addresses several of the Land Use Policies established <br /> in the General P�an. Poli�y L-1 states "residentia! develo�msnt �ho�.�ld be located only <br /> where services and facilities can be provided." As part of the DA the City and project <br /> developer have set the terms and parameters for issues such as infrastructure planning, <br /> which wauld incfude roadway improvements, pedestrian and bicycle access <br /> improvements, water and sewer service, recycled water service, wastewater service, <br /> and storm drain provisions. <br /> Policy L-3 states "higher residential densities should be promoted at locations near or <br /> within commercial and financial centers, employment centers, and transportation <br /> terminais." The Peninsula Park site is an infill development site located east of U.S. <br /> Highway 101 and within clase proximity to Redwood City's Downtown to the west, and <br /> employmen# centers such as Seapart Center and Pacific Shores to the south and east, <br /> respectively. Addifionally, the project will incorporate the use of a shuttle and a <br /> pedestrian/bicycle underpass (under U.S. Highway 101) connecting residents to the <br /> Downtpwn and Redwood City's transit center (i.e. Caltrain and Samtrans}. <br /> Policy L-4 states "corrmercial land should be distributed in a manner that maximizes <br /> community accessibility to a variety of retail commercial outlets and services and <br /> minimizes the need for automobile travel." As proposed, the Peninsula Park project will <br /> incorporate 1 J,QOQ — 12,000 square feet ofi sPniice retail for existing and new residents <br /> of #his emerging neighborhaod. The retail would be comprised of a 2,500 square foot <br /> high quality restaurant and 7,500 square feet of convenience refiai[, such as a coffee <br /> shop, convenience grocery, dry ciean�rs, e�c. <br /> Policy L-11 stafies "park land should be provided in quan#ity and locations so as to be <br /> availabie far the use of all Redwood City residents equally." The Peninsula Park project <br /> provides a 2 acre community park adjacent to Bair Island Road that is accessible to the <br /> public. In addition to the community park the project also includes an outer esplanade <br /> that provides waterfront access to Redwood Creek, an inner esplanade that provides <br /> waterfront access to the Peninsula Park marina and canals, and two overlook parks <br /> located o� either side of the marina entrance. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.