Laserfiche WebLink
7C <br /> Throughout the review of this project, staff will continue to make necessary adjustrrients Page 13 <br /> and optimize public outreach efforts ta the extent feasible. <br /> Future Steps <br /> If the City Council chooses to make the project related approvals outlined in this report, <br /> it is anti�ipated that the second reading �ar��re d�sociatet3 Ordinances would came back <br /> to the City Council in January 2008. Following the City's entitlement process the <br /> applicant will need to obtain a series of County, Stafe, and Federal permits prior to any <br /> site preparation and grading work related to the marina basin. <br /> Each phase of the devefopment would a(so require the applicant to: 1) s�bmit design <br /> documents, which are subject to the City's design review process with the Architectural <br /> Review Committee; 2) obtain a Planned Community "PC" permit, as defined in the <br /> Implementation section of the Precise Plan; and 3) obtain a Tentative Map approval and <br /> record a Final Map. <br /> A1 TF(�j�,lp'FI�/FS <br /> 1. Continuation of ineeting: If the City Council is unable to reach a decision at this <br /> meeting, the Council may chose to continue this item to a subsequent meeting for <br /> further consideration. <br /> 2. Alfernafrve sife design: At the October 9, 20Q7 Planning Commission Study Session <br /> the applicant presented two reduced height alternatives. Plan B represented a <br /> project alternative with a 75-foot height scenario which incfuded an office building <br /> with a detached parking structure, free standing neighborhood serving retail <br /> buildings and five 6-story residential buildings with corner tower elemen#s, internal 6- <br /> story parking structures, and private at-grade courtyards <br /> Plan C represented a project alternative with a 65-foof height scenaria. Plan C also <br /> included an office building with a detached parking structure; however, the retail <br /> component in Plan C would be provided as a ground floar tenant space within one of <br /> the residential buiEdings fronting Bair Island Road, separated by a surface parking <br /> lot. All eight residential buildings are 5-s#ories with two floors of structured parking. <br /> The green spaces seen between the roof forms represent a roof top courtyard on top <br /> of the parking structure above the second floor, i.e. podium type. <br /> Both Plan B and Plan C woufd require the replacement of the hotel with office space <br /> and structured parking, the removal of the marina use, and reconfiguration/ <br /> repositioning of the waterway. Plan B and Plan C also represent a significant <br /> departure from #he urban design characteristics represented in the proposed project. <br /> This becomes most apparent when analyzing the pedestrian ground level <br /> experience, the waterfront orientation of the units, the two walls of ligh# per unit, and <br /> the variation in building massing and viewshed. <br /> Furthermore, Plan B and P1an C do not represent the type and scale of development <br /> that wauld require a Precise Plan. Therefore, i� Plan B or Plan C became the <br /> preferred project, the project could be made to confiorm to the General Commercial — <br /> Combined Residential Zoning District requirements in terms of density, height, and <br /> land use. As a result, it 'ss anticipated that the applicant would withdraw the Precise <br /> 13 <br />