My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7C <br /> Page 71 <br /> particular, it would resuft in substantially fewer residential units, #hus preventing the Project from <br /> attaining the basic objectives of addressing the demand for hausing and providing a#fordable <br /> housing opfions. Based on the foregoing and the discussion in Section 17.7 of the FEIR, the <br /> City finds that, on balance, the Prajec# woufd provide substantially greater public benefits than <br /> Alternative 7 and tha#Alternative 7 is not a feasible alternative to the Project. <br /> H. Reduced Commercial to Permit No Marina Fill lAtternative 81 <br /> Description: Alternative 8 assumes development of the Praject site with a <br /> residential-commercial complex with similar uses to the Project, but with a reduction in the <br /> scope of the deveiopmen#to eliminate aEl of the approximately 9.8 acres of marina fill assaciated <br /> with the Project. Alternative 8 also incfudes a reduction in the maximum residentia! structure <br /> height to '{SO feet, as compareu t�the 230-235�ee� r�axim�m resident�al structure heic�ht far the <br /> Project, and a reduction in the number of multi-story residential structures from 17 for the <br /> proposed Praject to seven. With these fimitations, Alternative 8 would yield appraximately 850 <br /> condominium r�sidential units for sale and approximately 203,fla0 square feet of commercial <br /> floor area, including approximately 5,00�square feet of convenience retail. Section 17.10 af the <br /> FEIR identifies Altemative 8 as the "environmentally superiar altemafive" under CEQA. <br /> Findings: As compared to the Project, Altemative 8 would result in substantially <br /> reduced, bu# still significan#, environmental impacts in the areas of land use, visual factors, <br /> transportation and circulation, biological resources, hydrolagy and water quality, infrastructure <br /> and public services, soils and geology, public health and safety, noise, cultural and historic <br /> resaurces, and air quality. With respect to population, housing and employment, Altemafive 8, <br /> despite having fewer new residential units than the proposed Project, wou[d nonetheless, <br /> because of the reduction in commercial deve{opment, have a positive effect an the existing <br /> citywide imbalance between jobs and employed residents, reducing in-commuting. Altarnative 8 <br /> would, however, not attain basic Praject objectives iden#ified in the discussion of the No Project <br /> Alternative above, with 56 percent fewer residential units than the proposed Project (and a <br /> substantial reduction in commercial retail and office floor area) and an overall scope of <br /> development which would reduce Project revenue so that the Project, if financially sustainable <br /> at a(I, could not generate sufficient revenue to provide public access, waterfront features and <br /> other community-serving amenities which are fundamental, identified Project objectives. Based <br /> on the foregoing and the discussion in Section 17.8 of the FEIR, the Ci#y finds that, on balance, <br /> the Project pravides substantially greater public benefi#s #han Alternative 8 and that Alternative $ <br /> is not a feasible alternative to the Praject. <br /> I. Alterna#ive Sites <br /> Descrip#ion: The FE{R considered the passibility of alter�ative sites for the <br /> Project and concluded that there are no specific sites of adequate size and general character <br /> available in the Mid-Peninsula subregion where development of such a project could be <br /> undertaken that would accomplish most of the basic objectives of the Project and would avoid or <br /> substantially lessen the identi�ed environmenta! impacts of the Project as proposed. <br /> Furthermore, the prajecf applicant owns the Peninsula Marina portion of the proposed site and <br /> has a lease aption to buy the Pete's Harbor portion. The project applicant has no cantrolling <br /> interest in any other property capable of ineeting most of the basic objectives of the Praject, nor <br /> can the applicant be reasanabfy expected ta be able to acquire or control any particular site <br /> ]arge enough ta permit suc� a development, even if such a site could be identifed, given the <br /> rarity of such sites in the Mid-Peninsula area (if any exist). <br /> Atty/Reso/Reso.i 772 50 <br /> 1213a7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.