Laserfiche WebLink
7C <br /> Page 71 <br /> particular, it would resuft in substantially fewer residential units, #hus preventing the Project from <br /> attaining the basic objectives of addressing the demand for hausing and providing a#fordable <br /> housing opfions. Based on the foregoing and the discussion in Section 17.7 of the FEIR, the <br /> City finds that, on balance, the Prajec# woufd provide substantially greater public benefits than <br /> Alternative 7 and tha#Alternative 7 is not a feasible alternative to the Project. <br /> H. Reduced Commercial to Permit No Marina Fill lAtternative 81 <br /> Description: Alternative 8 assumes development of the Praject site with a <br /> residential-commercial complex with similar uses to the Project, but with a reduction in the <br /> scope of the deveiopmen#to eliminate aEl of the approximately 9.8 acres of marina fill assaciated <br /> with the Project. Alternative 8 also incfudes a reduction in the maximum residentia! structure <br /> height to '{SO feet, as compareu t�the 230-235�ee� r�axim�m resident�al structure heic�ht far the <br /> Project, and a reduction in the number of multi-story residential structures from 17 for the <br /> proposed Praject to seven. With these fimitations, Alternative 8 would yield appraximately 850 <br /> condominium r�sidential units for sale and approximately 203,fla0 square feet of commercial <br /> floor area, including approximately 5,00�square feet of convenience retail. Section 17.10 af the <br /> FEIR identifies Altemative 8 as the "environmentally superiar altemafive" under CEQA. <br /> Findings: As compared to the Project, Altemative 8 would result in substantially <br /> reduced, bu# still significan#, environmental impacts in the areas of land use, visual factors, <br /> transportation and circulation, biological resources, hydrolagy and water quality, infrastructure <br /> and public services, soils and geology, public health and safety, noise, cultural and historic <br /> resaurces, and air quality. With respect to population, housing and employment, Altemafive 8, <br /> despite having fewer new residential units than the proposed Project, wou[d nonetheless, <br /> because of the reduction in commercial deve{opment, have a positive effect an the existing <br /> citywide imbalance between jobs and employed residents, reducing in-commuting. Altarnative 8 <br /> would, however, not attain basic Praject objectives iden#ified in the discussion of the No Project <br /> Alternative above, with 56 percent fewer residential units than the proposed Project (and a <br /> substantial reduction in commercial retail and office floor area) and an overall scope of <br /> development which would reduce Project revenue so that the Project, if financially sustainable <br /> at a(I, could not generate sufficient revenue to provide public access, waterfront features and <br /> other community-serving amenities which are fundamental, identified Project objectives. Based <br /> on the foregoing and the discussion in Section 17.8 of the FEIR, the Ci#y finds that, on balance, <br /> the Project pravides substantially greater public benefi#s #han Alternative 8 and that Alternative $ <br /> is not a feasible alternative to the Praject. <br /> I. Alterna#ive Sites <br /> Descrip#ion: The FE{R considered the passibility of alter�ative sites for the <br /> Project and concluded that there are no specific sites of adequate size and general character <br /> available in the Mid-Peninsula subregion where development of such a project could be <br /> undertaken that would accomplish most of the basic objectives of the Project and would avoid or <br /> substantially lessen the identi�ed environmenta! impacts of the Project as proposed. <br /> Furthermore, the prajecf applicant owns the Peninsula Marina portion of the proposed site and <br /> has a lease aption to buy the Pete's Harbor portion. The project applicant has no cantrolling <br /> interest in any other property capable of ineeting most of the basic objectives of the Praject, nor <br /> can the applicant be reasanabfy expected ta be able to acquire or control any particular site <br /> ]arge enough ta permit suc� a development, even if such a site could be identifed, given the <br /> rarity of such sites in the Mid-Peninsula area (if any exist). <br /> Atty/Reso/Reso.i 772 50 <br /> 1213a7 <br />