My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7C <br /> Page 70 <br /> height at the Peninsula Marina portion ofi the site woufd be further reduced to 205 feet. <br /> Alternative 6 would also result in less marina fill (approximately 10 acres)than the lnitia{ PrQject <br /> (approximately 11.54 acres). <br /> Findings: AI#ernatives 4, 5 and 6 are similar in number of residential units <br /> (1930) and commerciaf (office) square footage (150,000 square fee#). Alternative 6 contains an <br /> additional 12,50Q square feet af retail space (which, under the Project Development Agreement, <br /> would have to be timely developed to permit full residential development); and allows a hote! of <br /> up to 200 roams, which would not be included in the Initial Project, Alternative 4 or Alternative 5, <br /> as well as a number of significant design improvements. <br /> The additional retaiE space and development reconfiguration elements of <br /> Alternative fi are feasible measures which significantly reduce traffic generation visuaf impacts., <br /> Peak traffic fflr the hotel wiil not occur at the same #imes as peak traffic from #he <br /> rest of the Project. Therefore, incfusion of the hotel will not substantiaily increase po#entiai <br /> environmer�tal impacts. The proposed hotel will alsa provide significant economic development <br /> ber�efits to the City. The City has, therefore, determined that incorporating features of <br /> Alternative fi, with the hotel, provides the greatest feasible reduction of patential environmental <br /> impacts of any identified alternative for the Project. <br /> Both the Proposed Project and Alternative 6 set maximum Peninsula Marina <br /> Area building heights at 205 feet. H�wever, unlike the Proposed Project, Alternative 6 also <br /> limits average building heights to 14 stories, ar approximately 140 feet. This additiona! <br /> development standard substantially reduces the total number of housing units that can be <br /> developed and, consequen#ly, prevents the Project from reaching fundamental housing <br /> praduction objectives. For this reason, Alternative 6 is not a feasible alternative to the Proposed <br /> Project. <br /> G. Reduced Residential and increased Commercial Pius Reduced Buitdinq <br /> Heiahts and Reduced Marina Fill (Alternative 71 <br /> Description: Alfiernative 7 assumes development of a mixed use residential- <br /> commercial complex similar to the Initial Project, but with approximately one-third fewer <br /> residential units and two-thirds more commercial floor area. Altemative 7 would include 1,300 <br /> condominium residential units for sale (as compared to 1,930 for the proposed Project} and <br /> 535,E300 square feet of comrriercial floor area, including approximateiy 17,000 square feet of <br /> convenience retait. The layaut for Alternative 7 includes mare marina fll {10.8 acres as <br /> campared to 10 acres for the Project) and a reduction in residentiaE building intensity and height <br /> with eleven muiti-story resicfential structures (as compared to thirteen muiti-story residentia9 <br /> structures for the proposed Project) and a maximum building height of 205 feet as compared to <br /> 230-235 feet for the Project. <br /> Findings: As compared to the Project, Altemative 7 would resuli in reduced, but <br /> stil( signiticant, impacts in the areas of [land use, visual impacts, and� biolagical resources. <br /> Transpartation and circulation im�acts would be slightly increased as campared to the Project. <br /> Impacts in the areas of hydrology and water quafity, infrastructure and public services, saiis and <br /> geology, public health and safety, noise, cultural resources, and air quality would be similar to <br /> those of the proposed Prajeet. With respect to population, housing and employment, Aliernative <br /> 7 would have a less positive effect on the existing citywide imbalance between jobs and <br /> employed residents. Alterna#ive 7 would onfy partialiy attain most basic Project objectives. In <br /> Atty/Reso/Reso.1772 4� <br /> 121307 <br />
The URL can be used to link to this page
Your browser does not support the video tag.