My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7C <br /> Page 260 <br /> Attachment 3 <br /> PHASING SCHEDULE FOR ZONE B, ZONE AB, AND ALL 70NES IMPROVEMENTS <br /> This Attachrnent lists Project milestones Uy which time the East 101 Public Infrastructure Improvements <br /> shall be completed. Refer to Attachinent 1 for a map depicting the location of such improvements. The <br /> East 101 Public lnfrastructure Improvements shown on Attachment 1 but not on this Phasing Schedule <br /> are not required for the I'roject,but rather are required for the redevelopment of other properties. <br /> The milestones set forth in this Attachment ar�intended as a mandatory date by whick City will require <br /> s�ch,irz�provements to be completed, With consent�f City and Dev�loper, any of these improvemer,ts <br /> may be completed sooner or�nay be combir.ed�i�ith oi:her East 101 I'�:blic Infrastructuze Improvements <br /> for the puzposes of efticiency and cost savings. <br /> � �.mproven�ent Description Milestone event by which improvement is <br /> Designation to be completed <br /> R-W 101 Potable Water Line Under Prior to the issuance of the Certiftcate of <br /> Highway 101 and west of Occupancy for the hotel or the�rst Phase of <br /> Highway 101 residential development in tlie Project. <br /> B-SS2 Sanitary Sewer Line Sam.e as R-W101. <br /> B-SS3 San.itary Sewer Line Same as R-W101. <br /> B-W1. Potable Water Linc Same as R-W101. <br /> B-W2 Potable Water Line east of Same as R-W 101. <br /> Highwa 101 <br /> B-RW1 Recycl.ed Water Line Same as R-W101. <br /> AB-SSPS Sanitary Sewer Pu�n� Station Sarne as R-W 101. ---i <br /> R-Underpass Pedestrian Ui�derpass i�nder Hwy Prior to the Final Map approval that i.ncludes the <br /> l0t 500�'`residence in the Pro'ect. <br /> R-Bridge Blomquist Bridge Same as R-Und.erpass. <br /> R-New Road New Raad from Bridge cast to Saine as R-Underpass. <br /> Maple <br /> i R-R.Widen I East Bayshore Road Widenin.g Same as R-Underpass. <br /> � i <br /> R-RWiden2 Blomquist � Same as R-Underpass. <br /> R.econstructic�n/Wideilin <br /> 1026609-8 1 Q <br /> I2-12-07 4:U0 PM <br /> 1060930v4 33786/U012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.