Laserfiche WebLink
7C <br /> Page 261 <br /> IcnprovemenE Description Milestone evet�t by which improvement is to <br /> � Desiga�atiou be completed <br /> R-WBridge Waterline Under Bridge Prior to issuance of t:he Certificate of Oceupancy <br /> for the first phase of residential developmenf in <br /> the Project,but subject to Section 5 of the <br /> �nfrastructure and Financing Plan and the <br /> requirement that at all stages of build-out,Proj ect <br /> , shall provide water storage equal to a.t least a 3- <br /> da demand. <br /> R-WBlomquisf Potable Waterline from Seaport to Same as R-WBridge. . <br /> Brid�e <br /> RWTank Potable Water Tank � Same as R-WBrid�e. <br /> RWTankland Land for Potable Water Tank Same as R-WBridge. <br /> i oz���o��-s I 1 <br /> 12-12-0�4:60 P1v1 <br /> ifl6093�v4 3378b/U012 <br />