Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF SERVICES <br />Consultant shall provide thefollowing Services: <br />Phase 1: feasibility analysis for a site(s) that meets minimum and <br />optimum parcel size requirements <br />Task 1.1 Kick-off Meeting to discuss a workplan and develop a schedule <br />Consultant shall meet with key City staff to discuss parameters of the study, <br />and prepare a work plan, and next steps, and draft a schedule. <br />Deliverables: <br />a. Work plan <br />b. Schedule <br />Task 1.2 Site(s) Analysis and Assessment Report <br />Consultant shall provide technical site analysis that demonstrates the <br />opportunity and constraints of sites identified as available for their intended <br />use. The summary site analysis should include: <br />• Location <br />• Existing land usedesignation <br />• Utilities <br />• Current uses, if any <br />• Approximate size of parcel(s) <br />• Site accessibility <br />• Parking <br />• Site constraints, if any <br />Deliverable: <br />a. Site(s) analysis and assessment report <br />Task 1.3 Cost Analysis for land, construction and operating costs. <br />Consultant shall provide a cost analysis for each site identified. The cost <br />analysis should be incorporated into the opportunities and constraints <br />presentation. <br />1.2. The cost analysis should include, but not be limited to: <br />• Probable land and construction costs <br />• Probable operation costs, ifany <br />REV: 07-24-19 RL <br />Page 11 of 14 <br />ATTY/AGR.2019.207/LPA, Inc. <br />