My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2470
RedwoodCity
>
City Clerk
>
Ordinances
>
2010-2019
>
2019
>
Ord 2470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:33:50 PM
Creation date
12/3/2019 12:33:44 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
11/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/25/2019 <br />ARTICLE VII. — RESERVED. <br />SECTION 6. A new Article VIII of Chapter 9 of the Redwood City Code is hereby <br />adopted to read as follows: <br />ARTICLE VIII. - AMENDMENTS TO 2019 CALIFORNIA ELECTRICAL CODE: <br />Sec. 9.83. SECTION 300.6 (A) (4) OF THE ELECTRICAL CODE ADDED: Section 300.6 <br />(A) (4) of the Electrical Code is added to read as follows: <br />Section 300.6(A) (4). Metallic conduit shall not be used underground in those areas <br />indicated on the map entitled "Where Special Bay Mud Requirements Apply" <br />available through the City website. <br />9.84.-9.149. RESERVED. <br />SECTION 7. A new Article IX of Chapter 9 of the Redwood City Code is hereby <br />adopted to read as follows: <br />ARTICLE IX. - SEISMIC REQUIREMENTS: <br />Sec. 9.150. PROVISIONS CUMULATIVE; ALTERNATE DESIGNS: The provisions of <br />this Article shall be in addition to all other provisions of the Building Code insofar as the <br />same relate to lot grading, soils design, foundation design, construction design, structural <br />design, and other engineering design. Such provisions are not intended to prevent the <br />use of any engineering design not referred to herein provided any such alternate has been <br />approved by the Building Official. The Building Official may approve any such alternate <br />provided the Building Official finds after review of comprehensive design data submitted <br />by the applicant, that the design is for the purpose intended, and at least the equivalent <br />in strength, safety, and effectiveness. <br />Sec. 9.151. APPLICABILITY OF PROVISIONS: The provisions of this Article shall be <br />applicable to that portion of the City indicated on the map entitled "Where Special Bay <br />Mud Requirements Apply" available through the City website. <br />Sec. 9.152. STRUCTURAL DESIGN: All structural design shall be in accordance with <br />the California Building Code, 2019 Edition, or the California Residential Code, 2019 <br />edition, including lateral force provisions for wind and earthquake. <br />Sec. 9.153. FOUNDATION SYSTEMS: Foundation systems shall consist of mat, grill, <br />piles or a similar system with a demonstrated ability to resist differential settlement and <br />for tying the foundation elements together. Foundation design shall be in accordance with <br />the California Building Code, 2019 edition, or the California Residential Code, 2019 <br />edition. <br />Secs. 9.154.— 9.179. — RESERVED. <br />SECTION 8. A new Article X of Chapter 9 of the Redwood City Code is hereby <br />adopted to read as follows: <br />ATTY /ORD.499 /BUILDING CODE ADOPTION 2019 ORDINANCE NO. 2470 <br />REV: 11 -19 -19 RL MUFF NO. 305 <br />Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.