My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 RKH, Inc. Traffic Engineering Services
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Under $60K
>
Agmt08 RKH, Inc. Traffic Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2008 12:41:55 PM
Creation date
1/22/2008 9:10:02 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Richard K. Hopper
PROJECT NAME
Traffic Consultant
Date
1/18/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />134 Maple Street, EDSA. Redwood City <br />Proposal to Provide Traffic Engineering Services <br /> <br />C. RKH will conduct a parking generation study at the two sites designated in 4.A. <br />above. The study will look at peak weekday parking conditions. The study will <br />compare the findings with data contained in Parking Generation4 and will <br />recommend an appropriate rate for the project. The proposed parking layout will be <br />evaluated with respect to the findings of the parking generation study and the City's <br />parking standards to determine if it is functionally adequate. <br /> <br />8. Draft Report. RKH will prepare a draft report with text and graphics which will contain <br />the traffic impact analysis, fmdings, conclusions and recommendations for mitigating <br />identified traffic impacts. RKH will submit the draft report to the city for review and <br />comment. <br /> <br />9. Final Report. Upon receipt of written comments on the draft report, RKH will prepare the <br />final report. The final report will be submitted to the city for use in the project review and <br />approval process. <br /> <br />10. Public Meeting. RKH will attend one public meeting on the project. <br /> <br />ADDITIONAL SERVICES <br /> <br />The following are services outside of and in addition to those described as Basic Services: <br /> <br />1. Extra work due to changes in the project, delays, work not specifically described in the <br />Basic Services, and all other causes not the fault of RKH; <br /> <br />2. Changes in documents after approval and/or acceptance; <br /> <br />3. Collection and evaluation of new traffic data not specified in the Basic Services; <br /> <br />4. All public agency permits and permit fees, licenses and other such charges associated <br />directly with the project; <br /> <br />5. Attendance at public meetings not specified in the Scope of Basic Services. The fee to <br />attend a public meeting will be $480.00 per meeting. <br /> <br />6. Preparation of a Transportation Demand Management Plan. <br /> <br />7. Construction plan checking. <br /> <br />4 <br /> <br />4 Institute of Transportation Engineers, 3 rd Edition, @ 2004. <br /> <br />~.a+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.