Laserfiche WebLink
7.C. - Page 4 of 178 <br />• Promenade that extends into the park and will provide additional gathering, recreational, and <br />special event space; and <br />• 57 new parking spaces in the east parking lot. <br />Additionally, the building target is LEED Platinum Certification. Some of the green features of this <br />building include: <br />• Micro -grid consisting of rooftop photovoltaic array and integrated battery storage; <br />• No natural gas is used, helping to reduce greenhouse gases; <br />• Solar chimneys for natural ventilation, decreasing the need for mechanically conditioned air; <br />• Low -flow and high efficiency fixtures and equipment to conserve natural resources; and <br />• Solar shading to minimize heat gain and daylighting to provide natural lighting and decrease <br />energy consumption from lighting. <br />FIGURE 1— SITE PLAN MAP PHASE 1 <br />C— <br />io 1axloxloT, x1 LEGEND <br />To address existing traffic safety concerns, Phase 1 also includes the following traffic calming measures as <br />shown in Figure 2: <br />1) Installation of a new roundabout at Vera Avenue and Valota Road; <br />Page 4 of 17 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />427 <br />