Laserfiche WebLink
7.C. - Page 5 of 178 <br />2) Installation of a new median island and curb extensions at the Valota Road and Madison Avenue <br />intersection; <br />3) Installation of a new mini traffic circle at Madison Avenue and Myrtle Street; and <br />4) Expansion of the existing traffic circle at Hudson Street and Madison Avenue and removal of the <br />two-way stop control on Madison Avenue. <br />FIGURE 2 — Site Plan Traffic Calming Measures <br />Phase 2: Sequoia YMCA <br />Staff anticipates that Phase 2 will be submitted to the City for entitlements following CEQA certification. <br />While neither phase of the project requires a Zoning Map Amendment for the proposed land uses, staff <br />is recommending a Zoning Map Amendment to Public Facilities (PF) for consistency with the General Plan <br />designation, Parks. Phase 2 will also require an Architectural Permit. <br />The new two-story (up to 35 foot tall), approximately 35,000 square foot YMCA building would include <br />the following components: <br />• Health and wellness center with exercise machines, weight lifting machines, and free weights, and <br />space to host exercise and stretching classes; <br />• Aquatic center with an indoor and outdoor pool; <br />• Daycare facility of approximately 2,700 square feet with three classrooms and capacity for 72 <br />children, a children's play area composed of a lawn and concrete paved areas, several play <br />structures, and 10 short-term parking spaces for the daycare facility within the west parking lot; <br />Page 5 of 17 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />428 <br />