My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.C. - Page 37 of 178 <br />In subsection 15126.6(c), the State CEQA Guidelines describe the selection process for a range of reasonable <br />alternatives: <br />(c) The range of potential alternatives to the proposed project shall include those that could feasibly <br />accomplish most of the basic objectives of the Project and could avoid or substantially lessen <br />one or more of the significant effects. The EIR should briefly describe the rationale for selecting <br />the alternatives to be discussed. The EIR should also identify any alternatives that were <br />considered by the lead agency but were rejected as infeasible during the scoping process and <br />briefly explain the reasons underlying the lead agency's determination. Additional information <br />explaining the choice of alternatives may be included in the administrative record. Among the <br />factors that may be used to eliminate alternatives from detailed consideration in an EIR are: (i) <br />failure to meet most of the basic project objectives, (ii) infeasibility, or (iii) inability to avoid <br />significant environmental impacts. <br />The range of alternatives required is governed by a "rule of reason" that requires the EIR to set forth only those <br />alternatives necessary to permit a reasoned choice. The EIR shall include sufficient information about each alternative <br />to allow meaningful evaluation, analysis, and comparison with the proposed Project. Alternatives are limited to ones <br />that would avoid or substantially lessen any of the significant effects of the Project. Of those alternatives, the EIR need <br />examine in detail only the ones that the lead agency determines could feasibly attain most of the basic objectives of <br />the Project. <br />A. Project Objectives. <br />The Final EIR evaluates a number of potential alternatives to the proposed project. The Final EIR examines the <br />environmental impacts of each alternative in comparison with the proposed project and the relative ability of each <br />alternative to satisfy project objectives. The project objectives are as follows: <br />I. Replace the aging VMSC and reduce escalating maintenance costs with a new approximately 45,000 square <br />foot Veterans Memorial Building/Senior Center to enhance the existing seniors' programs and have spaces <br />including a special veterans exhibits honoring Redwood City and San Mateo County veterans and office space <br />for non-profit groups and the NFL Alumni Northern California Chapter. <br />2. Form a public/non-profit partnership with the YMCA to re -imagine the aging Veterans Memorial Senior <br />Center and Sequoia YMCA to meet the changing health living, recreational and social needs of seniors, <br />veterans, youth and families and ensure the Sequoia YMCA is able to remain in Redwood City. <br />3. Enhance and expand the existing membership at the Sequoia YMCA by providing a new approximately 35,000 <br />square foot YMCA with a fitness center, multipurpose rooms, indoor and outdoor pools and a childcare facility <br />open to the public. <br />4. Provide year round aquatics with new indoor and outdoor swimming pools, as the City is currently only able <br />to offer seasonal use of an aging center with growing maintenance costs. <br />5. Enhance the community quality of life by expanding health and wellness opportunities for all ages and <br />enhancing the community's fitness, wellness, and recreation resources. <br />6. Provide state -of -the art community facility with multiple recreational opportunities for a growing community <br />— both in population and age. <br />7. Provide a public promenade with flexible outdoor gathering spaces that would provide a gateway to Red <br />Morton Park and link both buildings. <br />8. Design the new VMSC to meet a minimum of LEED Certification standards. <br />9. Provide a new public facility that could have the dual purpose of providing an emergency shelter or evacuation <br />center in the event of an emergency. <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 20 of 44 <br />E.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.