My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.C. - Page 50 of 178 <br />Mitigation Monitoring or Reporting Program <br />Veterans Memorial Senior Center/YMCA Project (SCH #2016112041) <br />Timeframe for <br />Responsibility <br />Oversight of <br />Impacts <br />Mitigation <br />Implementation <br />for <br />mplementation <br />Implementation <br />MM CUL -1.2: The City shall be responsible for the production <br />Prior to issuance <br />City of Redwood <br />Director of <br />and placement of an interpretive display in the new <br />of occupancy <br />City <br />Community <br />VMSC/YMCA facility that describes the history and significance <br />permit <br />Development <br />of the senior center, using photographs and drawings in addition to <br />narrative text. The display shall be placed in a prominent space <br />within the new building. <br />Impact CUL -2: The <br />MM CUL -2.1: Prior to the issuance of grading permits, the <br />Prior to the <br />Project applicant <br />Director of <br />project would not cause <br />project applicant is responsible for ensuring all construction crews <br />issuance of <br />Community <br />a substantial adverse <br />undergo adequate training for the identification of federal or state- <br />grading permits <br />Development <br />change in the <br />eligible cultural resources, and that the construction crews are <br />significance of an <br />aware of the potential for previously undiscovered archaeological <br />archaeological resource <br />resources, of the laws protecting these resources and associated <br />pursuant to CEQA <br />penalties, and of the procedures to follow should they discover <br />Guidelines Section <br />cultural resources during project -related work. <br />15064.5 with mitigation <br />incorporated. <br />MM CUL -2.2: A certified archeologist and a culturally affiliated <br />During all <br />Project applicant <br />Director of <br />Native American with knowledge of cultural resources shall <br />ground -disturbing <br />Community <br />Less than Significant <br />monitor all ground -disturbing activities. If deposits of prehistoric <br />activities <br />Development <br />Impact with Mitigation <br />or historic archeological materials are encountered during project <br />Development <br />Incorporated <br />construction activities, all work within an appropriate buffer area <br />Department <br />(no less than 50 feet) around the discovery shall be stopped and a <br />qualified archeologist meeting federal criteria under 36 CFR 61, in <br />consultation with the culturally affiliated Native American with <br />knowledge of cultural resources, shall be contacted to assess the <br />deposit(s) and make recommendations. <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 33 of 44 473 <br />
The URL can be used to link to this page
Your browser does not support the video tag.