My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.C. - Page 51 of 178 <br />Mitigation Monitoring or Reporting Program <br />Veterans Memorial Senior Center/YMCA Project (SCH #2016112041) <br />Timeframe for <br />Responsibility <br />Oversight of <br />Impacts <br />Mitigation <br />Implementation <br />for <br />mplementation <br />Implementation <br />If the deposits are recommended to be non-significant by a <br />qualified archeologist in consultation with the culturally affiliated <br />Native American with knowledge of cultural resources, avoidance <br />is not necessary. If the deposits are determined to be potentially <br />significant by the qualified archeologist in consultation with the <br />culturally affiliated Native American with knowledge of cultural <br />resources, the resources shall be avoided. If avoidance is not <br />feasible, project impacts shall be mitigated in accordance with the <br />recommendations of the qualified archaeologist, in coordination <br />with the City Planning, Housing, and Economic Development <br />Department and CEQA Guidelines Section 15126.4 (b)(3)(C), <br />which requires implementation of a data recovery plan. <br />The data recovery plan shall be prepared and implemented by a <br />qualified archaeologist. The data recovery plan shall include <br />provisions for adequately recovering all scientifically <br />consequential information from and about any discovered <br />archeological materials and include recommendations for the <br />treatment of these resources. In-place preservation of the <br />archeological resource is the preferred manner of mitigating <br />potential impacts, as it maintains the relationship between the <br />resource and the archeological context. In-place preservation also <br />reduces the potential for conflicts with the religious or cultural <br />values of groups associated with the resource. Other mitigation <br />options include, but are not limited to, the full or partial removal <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 34 of 44 474 <br />
The URL can be used to link to this page
Your browser does not support the video tag.