Laserfiche WebLink
7.C. - Page 53 of 178 <br />Mitigation Monitoring or Reporting Program <br />Veterans Memorial Senior Center/YMCA Project (SCH #2016112041) <br />Timeframe for <br />Responsibility <br />Oversight of <br />Impacts <br />Mitigation <br />Implementation <br />for <br />mplementation <br />Implementation <br />other agencies with <br />sensitive land uses. Temporary noise barrier fences would <br />mitigation incorporated. <br />provide a five dBA noise reduction if the noise barrier <br />interrupts the line -of -sight between the noise source and <br />Less than Significant <br />receptor and if the barrier is constructed in a manner that <br />Impact with Mitigation <br />eliminates any cracks or gaps. <br />Incorporated <br />• If stationary noise -generating equipment is located near <br />receptors, adequate muffling (with enclosures where <br />feasible and appropriate) shall be used. Any enclosure <br />openings or venting shall face away from sensitive <br />receptors. <br />• Construction staging areas (including material stockpiles, <br />maintenance/equipment staging, and parking areas) shall <br />be established at locations that would create the greatest <br />distance between the construction -related noise sources <br />and noise -sensitive residential receptors nearest the project <br />site during all project construction. <br />• Generators, compressors, and pumps shall be housed in <br />acoustical enclosures. <br />• Where feasible, temporary power service from local utility <br />companies should be used instead of portable generators. <br />• Locate cranes as far from adjoining noise -sensitive <br />residential receptors as possible. <br />• During final grading, substitute graders for bulldozers. <br />Wheeled heavy equipment are quieter than track <br />equipment. <br />• Substitute nail guns for manual hammering. <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 36 of 44 476 <br />