Laserfiche WebLink
7.C. - Page 55 of 178 <br />Mitigation Monitoring or Reporting Program <br />Veterans Memorial Senior Center/YMCA Project (SCH #2016112041) <br />Timeframe for <br />Responsibility <br />Oversight of <br />Impacts <br />Mitigation <br />Implementation <br />for <br />mplementation <br />Implementation <br />post a telephone number for the disturbance coordinator at <br />the construction site and include in it the notice sent to <br />neighbors regarding the construction schedule. <br />MM NOI-1.2: Mechanical equipment shall be selected and <br />During the final <br />Project applicant <br />Director of <br />designed to reduce impacts on surrounding uses to meet ambient <br />design phase <br />Community <br />noise conditions at the nearest residential land uses during both <br />Development <br />daytime and nighttime conditions. A qualified acoustical <br />consultant shall be retained to review mechanical noise as these <br />systems are selected to determine specific noise reduction <br />measures necessary to comply with the City's noise level <br />requirements. Noise reduction measures could include, but are not <br />limited to, selection of equipment that emits low noise levels <br />and/installation of noise barriers, such as enclosures and parapet <br />walls, to block the line -of -sight between the noise source and the <br />nearest receptors. Alternate measures may include locating <br />equipment in less noise -sensitive areas, such as indoors or the <br />rooftop of the buildings away from the building's edge nearest the <br />noise -sensitive receptors. <br />Impact NOI-2: The <br />MM NOI-2.1: In addition to the noise controls outlined in <br />During all <br />Project applicant <br />Director of <br />project would not result <br />General Plan Program PS -63 and mitigation measure MM NOI- <br />construction <br />Community <br />in generation of, <br />1. 1, the project shall implement the following measures where <br />activities <br />Development <br />excessive groundbome <br />vibration levels due to construction activities would exceed 0.3 <br />vibration or <br />in/sec PPV at nearby sensitive uses: <br />groundbome noise <br />ATTY/RESO.0124/CC RESO RECOMMENDING CEQA CERTIFICATION -YMCA <br />REV: 12-12-19 IY <br />Page 38 of 44 478 <br />