My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
12/13/2019 1:44 PM
Modified:
12/13/2019 1:44 PM
Text:
https://www.redwoodcity.org/departments/community-development-department/planning-housing/planning-services/environmental-documents/general-plan-eir
ID:
2
Creator:
Created:
12/13/2019 1:44 PM
Modified:
12/13/2019 1:44 PM
Text:
https://www.redwoodcity.org/departments/community-development-department/planning-housing/planning-services/environmental-documents/general-plan-eir
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.D. - Page 21 of 126 <br />Introduction <br />(A) The project will have one or more significant effects not discussed in the previous EIR <br />or negative declaration <br />(B) Significant effects previously examined will be substantially more severe than shown in <br />the previous EIR <br />(C) Mitigation measures or alternatives previously found not to be feasible would in fact <br />be feasible, and would substantially reduce one or more significant effects of the <br />project, but the project proponents decline to adopt the mitigation measure or <br />alternative <br />(D) Mitigation measures or alternatives which are considerably different from those <br />analyzed in the previous EIR would substantially reduce one or more significant effects <br />on the environment, but the project proponents decline to adopt the mitigation <br />measure or alternative <br />Pursuant to Section 15164(a) of the CEQA Guidelines, an addendum to an EIR may be prepared by <br />the Lead Agency that prepared the original EIR if some changes or additions to the project have <br />become necessary, but none of the conditions have occurred that require preparation of a <br />Subsequent EIR. An addendum must include a brief explanation of the agency's decision not to <br />prepare a Subsequent EIR, supported by substantial evidence in the record as a whole (Section <br />15164(e)). The addendum to the EIR need not be circulated for public review, but it may be included <br />in or attached to the Final EIR (Section 15164(c)). The decision-making body must consider the <br />addendum and the EIR prior to making a decision on the project (Section 15164(d)). <br />1.7 Background and Planning History <br />1.7.1 General Plan for Redwood City and Program Final EIR <br />On October 11, 2010, the City Council of Redwood City certified the Final EIR for the General Plan for <br />Redwood City and adopted by resolution a comprehensive update of the General Plan. The General Plan <br />represented a transformation from the prior 1990 General Plan, and it established new policies, goals, <br />and implementation programs for the long-term physical development of Redwood City, constituting the <br />blueprint for how the city will look, how development will occur, and providing a framework for the <br />provision of City programs and services. The General Plan responded to state laws current at the time it <br />was written. It addresses housing, urban form, circulation, atmosphere and climate, water resources, <br />child care, seniors, health, historic resources, economic development, safety, and sustainability initiatives <br />in the city. The General Plan includes significant revisions to the land use map and completely new text, <br />proposing progressive, innovative programs and policies for certain corridors and focus areas. <br />The certified Final EIR provided a programmatic analysis of the potential impacts of the buildout of the <br />General Plan. In conjunction with the certification of the Final EIR in October 2010, the City Council also <br />adopted Findings of Fact, a Mitigation Monitoring and Reporting Program (MMRP), and a Statement of <br />Overriding Considerations. The CEQA Findings adopted by the City indicate the General Plan would result <br />in certain significant environmental impacts that could not be fully avoided by implementation of the <br />feasible mitigation measures. These include impacts to air quality, transportation, utilities, and global <br />climate change. Information and technical analyses from the certified Final EIR are referenced <br />throughout this addendum. The entire Final EIR is available for review at City offices located at 1017 <br />Middlefield Road, Redwood City, California 94064, and online at <br />https://www. redwoodcity.o rg/departments/community-development-department/pl a n n i ng- <br />housing/planning-services/environmental-documents/general-plan-eir. <br />Addendum to the Final Environmental Impact Report <br />622 <br />
The URL can be used to link to this page
Your browser does not support the video tag.