My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.D. - Page 20 of 126 <br />City of Redwood City <br />Mixed -Use Live/Work and Emergency Shelter Zoning Amendment Project <br />1.3 Project Location <br />The project location includes all areas in the MULW zoning district and MULW-S combining district <br />(30 blocks) in the City of Redwood City. Figure 1 illustrates the location of Redwood City in the <br />region, and Figure 2 shows the areas of the city zoned MULW. <br />1.4 Lead Agency and Address <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, California 94063 <br />1.5 Contact Person and Phone Number <br />Lindy Chan, Principal Planner <br />City of Redwood City <br />(650) 780-7237 <br />email: Ichan@redwoodcity.org <br />1.6 Statutory Authority <br />CEQA recognizes that between the date an environmental document for a project is completed and <br />the date that project is fully implemented, one or more of the following changes may occur: 1) the <br />project may change; 2) the environmental setting in which the project is set may change; and/or 3) <br />previously unknown information can arise. Before proceeding with a project, CEQA requires the lead <br />agency to evaluate these changes to determine whether they affect the conclusions in the prior <br />environmental document. <br />When an EIR has been certified and a project is modified or otherwise changed after certification, <br />additional CEQA review may be necessary. The key considerations in determining the need for the <br />appropriate type of additional CEQA review are outlined in Section 21166 of the Public Resources <br />Code (CEQA) and CEQA Guidelines Sections 15162 and 15164. <br />Section 15162(a) of the CEQA Guidelines provides that a Subsequent EIR is not required unless any <br />or all of the following occurs: <br />(1) Substantial changes are proposed in the project which will require major revisions of the <br />previous EIR or negative declaration due to the involvement of new significant <br />environmental effects or a substantial increase in the severity of previously identified <br />significant effects <br />(2) Substantial changes occur with respect to the circumstances under which the project is <br />undertaken which will require major revisions of the previous EIR or Negative Declaration <br />due to the involvement of new significant environmental effects or a substantial increase in <br />the severity of previously identified significant effects <br />(3) New information of substantial importance, which was not known and could not have been <br />known with the exercise of reasonable diligence at the time the previous EIR was certified <br />as complete or the Negative Declaration was adopted, shows any of the following: <br />621 <br />
The URL can be used to link to this page
Your browser does not support the video tag.