7.D. - Page 34 of 126 <br />City of Redwood City <br />Mixed -Use Live/Work and Emergency Shelter Zoning Amendment Project <br />3 Environmental Analysis <br />The 2010 Final EIR for the General Plan analyzed environmental impacts associated with adoption <br />and implementation of the General Plan. This section reviews the conclusions of the 2010 Final EIR <br />and assesses the potential for the proposed changes to the City's zoning ordinance and General Plan <br />to have new or revised impacts on the environment. <br />3.1 Conclusions of the 2010 Final EIR <br />The 2010 Final EIR for the General Plan examined the impacts associated with the adoption and <br />long-term implementation of the General Plan. The Final EIR concluded there were significant, <br />unavoidable environmental impacts, impacts that could be reduced to less than significant with <br />mitigation, impacts that were less than significant, and impacts that were beneficial. The impacts <br />identified to be significant and unavoidable were: <br />■ Air Quality Impact 4.3-1. The projected population growth allowed by the General Plan would <br />be inconsistent with growth projections in the regional Clean Air Plan (2010), in that the <br />projected population allowed by the General Plan would increase at a greater rate than regional <br />projections utilized within the Clean Air Plan. <br />■ Transportation Impact 4.14-1. New development allowed under the General Plan could cause <br />an increase in traffic that is substantial in relation to the existing traffic load and capacity of the <br />roadway system and result in unacceptable service levels on some roadway segments based on <br />LOS policy. <br />■ Utilities Impact 4.15-4. Development allowed by the General Plan could generate an increase in <br />future demand for water supply that is not anticipated to be fully met by the City's existing and <br />future water supplies. <br />■ Global Climate Change Impact 4.16-2. The General Plan would allow for new development to <br />occur in areas that may be subjected to tidal inundation if sea level rises; this could place <br />additional people and structures at elevated risk of exposure to flood hazards associated with <br />long-term sea level rise. <br />In total, the 2010 Final EIR identified three beneficial impacts, 48 less than significant impacts, 19 <br />impacts that were less than significant with mitigation, and the four significant and unavoidable <br />impacts described above. <br />3.2 Changes in Environmental Circumstances <br />While changes have occurred in other areas of the city within other zoning designations, limited <br />development has occurred in the MULW-designated areas since the Final EIR was certified. No <br />significant changes have occurred in environmental circumstances since certification of the Final EIR <br />for the General Plan in October 2010. No major development activity has been completed in the <br />areas under consideration for zoning changes. Given the existing urbanized condition of the areas <br />proposed for zone changes, future development proposals would generally involve the demolition <br />of existing structures and their replacement with new structures and uses; new projects would not <br />affect previously undisturbed areas. Individual developments in the areas zoned MULW or MULW-S <br />would be required to undergo project -specific environmental review pursuant to CEQA. Some <br />V <br />635 <br />