My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-12-16 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-12-16 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:17:00 PM
Creation date
12/13/2019 1:39:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/16/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.D. - Page 35 of 126 <br />Environmental Analysis <br />roadway improvements have occurred since October 2010, including the addition of a pedestrian <br />signal timing phase across Woodside Road at Middlefield Road, signalization of the intersections of <br />Broadway and Douglas Avenue and Broadway and Charter Street, and modification of the railroad <br />crossing at Main Street and Whipple Avenue. Caltrans approval was also received for the Route <br />101/84 (Woodside Road) interchange, which would increase capacity at that location, but <br />construction has not yet started. However, these changes would not represent major changes in the <br />MULW-designated area. No major roadway or other infrastructure improvements have been <br />initiated since October 2010 in the areas under consideration. Thus, no substantial changes have <br />occurred with respect to the circumstances under which the project will be undertaken. <br />3.3 Comparison of Impacts Identified in the 2010 Final <br />EIR and Impacts Associated with the Proposed <br />Project <br />The proposed project would not change the policies adopted in the General Plan; rather, the new <br />provisions in the Zoning Ordinance would implement adopted policy, previously considered in the <br />2010 Final EIR for the General Plan. As noted in the General Plan, "the Urban Form and Land Use <br />goals, policies, and implementation programs focus new growth into mixed use activity centers and <br />along corridors that are pedestrian friendly, serve as centers of community, and easily link to the <br />regional transit system. Increased development densities and intensities in the infill areas and <br />innovative parking approaches, which will be implemented primarily through zoning regulations, will <br />incentivize smart growth" (City of Redwood City 2010a page BE -55). The new zoning regulations <br />would implement this direction within the guidance of the maximum densities and intensities of <br />development outlined by the General Plan. <br />The proposed project would not involve direct changes to the physical environment, as adoption of <br />the amendments to the MULW zoning ordinance itself would not involve physical development <br />activity, but is a regulatory change that sets standards for the use and development of MULW <br />properties in Redwood City. Table 3 compares impacts identified in the 2010 Final EIR with those <br />associated with adoption of the MULW zoning ordinance amendments. The analysis in the table <br />indicates that no new significant impacts would occur, and that no previously identified impacts <br />would increase in severity. <br />3.4 Cumulative Impacts <br />This cumulative impact analysis accounts for development under the proposed project in <br />conjunction with other development under the City's General Plan. According to the Final EIR for <br />the City's General Plan, Impacts 4.3-1, 4.14-1, 4.15-4, and 4.16-2 were determined to be significant <br />and unavoidable; all other impacts were determined to be less than significant with adherence to <br />existing regulations, General Plan policies and implementation programs and/or mitigation <br />measures. <br />As described above in Section 3.3, the proposed project would result in no new or substantially <br />more severe direct or indirect significant impacts beyond those identified in the previously certified <br />Final EIR for the General Plan and the 2013 Addendum for the General Plan. The cumulative <br />contribution of the proposed project impacts would not substantially exceed those assumed and <br />analyzed in the certified Final EIR. No new or reasonably foreseeable future projects have been <br />Addendum to the Final Environmental Impact Report 19 <br />636 <br />
The URL can be used to link to this page
Your browser does not support the video tag.